Arc SAR remodeling (Q2982589): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
(‎Removed claim: budget (P474): 37,964.53 euro)
Property / budget
37,964.53 Euro
Amount37,964.53 Euro
UnitEuro
 
Property / budget: 37,964.53 Euro / rank
Normal rank
 

Revision as of 04:28, 22 October 2021

Project Q2982589 in Portugal
Language Label Description Also known as
English
Arc SAR remodeling
Project Q2982589 in Portugal

    Statements

    0 references
    1 November 2017
    0 references
    31 December 2020
    0 references
    MUNICÍPIO DE VILA FLOR
    0 references
    0 references
    0 references

    41°16'52.25"N, 7°7'1.16"W
    0 references
    Com esta operação pretende-se dotar a ETAR existente de uma obra de entrada que garanta a eficiência dos equipamentos a jusante, de modo a ser assegurado o tratamento satisfatório das águas residuais urbanas da localidade de Arco, pertencente à União das freguesias de Vila Flor e Nabo. (Portuguese)
    0 references
    With this operation it is intended to equip the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of the locality of Arco, belonging to the Union of the parishes of Vila Flor and Nabo. (English)
    9 July 2021
    0 references
    Vila Flor, União das freguesias de Vila Flor e Nabo
    0 references

    Identifiers

    POSEUR-03-2012-FC-000848
    0 references