Renewal of Water Supply Networks (Ribeira Brava, Câmara de Lobos, Machico and Santana) (Q2982936): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
(‎Removed claim: budget (P474): 521,867.39 euro)
Property / budget
521,867.39 Euro
Amount521,867.39 Euro
UnitEuro
 
Property / budget: 521,867.39 Euro / rank
Normal rank
 

Revision as of 05:50, 22 October 2021

Project Q2982936 in Portugal
Language Label Description Also known as
English
Renewal of Water Supply Networks (Ribeira Brava, Câmara de Lobos, Machico and Santana)
Project Q2982936 in Portugal

    Statements

    0 references
    5 November 2019
    0 references
    28 February 2021
    0 references
    A.R.M. - ÁGUAS E RESÍDUOS DA MADEIRA, S.A.
    0 references
    0 references
    0 references
    A Operação visa correção de situações operacionais identificadas (falhas abastecimento), que consistem, na substituição de troços de redes subdimensionados, nos quais se registam pressões desajustadas, caudal reduzido. A construção de 2 EE permitirá o aumento da capacidade de distribuição, solucionar as faltas de pressão no abastecimento naquelas zonas, uma vez que a rede implementada se revela insuficiente para satisfazer os consumos. (Portuguese)
    0 references
    The Operation aims at correcting identified operational situations (supply failures), which consist of replacing sections of undersised networks, where there are misadjusted, low flow pressures. The construction of 2 EE will make it possible to increase the distribution capacity, to address the lack of pressure on supply in those areas, since the network implemented is insufficient to satisfy consumption. (English)
    9 July 2021
    0 references

    Identifiers

    POSEUR-03-2012-FC-001421
    0 references