Q3105767 (Q3105767): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Created claim: summary (P836): The implementation of the project will ensure that the global energy performance indicator with a nearly zero energy demand for the category of administrative building in class A0 is met. The aim of the project will be fulfilled by the implementation of the works of insulation of the perimeter wall, ceiling above the basement and floor in the attic in accordance with the applicable heat technical standards, replacement of luminaires ensuring ele...) |
||||||||||||||
Property / summary | |||||||||||||||
The implementation of the project will ensure that the global energy performance indicator with a nearly zero energy demand for the category of administrative building in class A0 is met. The aim of the project will be fulfilled by the implementation of the works of insulation of the perimeter wall, ceiling above the basement and floor in the attic in accordance with the applicable heat technical standards, replacement of luminaires ensuring electricity saving, hydraulic control of the heating system with reconstruction of the boiler room and heat recovery by installing the ventilation unit. (English) | |||||||||||||||
Property / summary: The implementation of the project will ensure that the global energy performance indicator with a nearly zero energy demand for the category of administrative building in class A0 is met. The aim of the project will be fulfilled by the implementation of the works of insulation of the perimeter wall, ceiling above the basement and floor in the attic in accordance with the applicable heat technical standards, replacement of luminaires ensuring electricity saving, hydraulic control of the heating system with reconstruction of the boiler room and heat recovery by installing the ventilation unit. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The implementation of the project will ensure that the global energy performance indicator with a nearly zero energy demand for the category of administrative building in class A0 is met. The aim of the project will be fulfilled by the implementation of the works of insulation of the perimeter wall, ceiling above the basement and floor in the attic in accordance with the applicable heat technical standards, replacement of luminaires ensuring electricity saving, hydraulic control of the heating system with reconstruction of the boiler room and heat recovery by installing the ventilation unit. (English) / qualifier | |||||||||||||||
point in time: 15 September 2021
|
Revision as of 15:08, 15 September 2021
Project Q3105767 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3105767 in Slovakia |
Statements
57,909.28 Euro
0 references
68,128.56 Euro
0 references
0.85 percent
0 references
4 January 2017
0 references
9 January 2021
0 references
Štatistický úrad Slovenskej republiky
0 references
Realizáciu projektu bude zabezpečené splnenie globálneho ukazovateľa energetickej hospodárnosti s takmer nulovou potrebou energie pre kategóriu administratívnej budovy v triede A0. Cieľ projektu bude naplnený realizáciou prác zateplenia obvodovej steny, stropu nad suterénom a podlahy v podkroví v súlade s platnými teplo technickými normami, výmenu svietidiel zabezpečujúcich úsporu elektrickej energie, hydraulické vyregulovanie vykurovacieho systému s rekonštrukciou kotolne a rekuperáciu tepla inštaláciou vzduchotechnickej jednotky. (Slovak)
0 references
The implementation of the project will ensure that the global energy performance indicator with a nearly zero energy demand for the category of administrative building in class A0 is met. The aim of the project will be fulfilled by the implementation of the works of insulation of the perimeter wall, ceiling above the basement and floor in the attic in accordance with the applicable heat technical standards, replacement of luminaires ensuring electricity saving, hydraulic control of the heating system with reconstruction of the boiler room and heat recovery by installing the ventilation unit. (English)
15 September 2021
0 references
Identifiers
310041U115
0 references