Q3103276 (Q3103276): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Created claim: summary (P836): The aim of the project is to modernise building No. 11 operating building in the Institute for the execution of prison sentence Nitra-Chrenová, ensuring the energy efficiency of the building while using it and reducing the energy intensity (actual energy consumption). The above objective will be achieved by improving the thermal and technical properties of building materials, modernising the systems installed in the building in order to reduce t...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to modernise building No. 11 operating building in the Institute for the execution of prison sentence Nitra-Chrenová, ensuring the energy efficiency of the building while using it and reducing the energy intensity (actual energy consumption). The above objective will be achieved by improving the thermal and technical properties of building materials, modernising the systems installed in the building in order to reduce the costs of heating, hot water and lighting, improving the quality of packaging contrusions and internal thermal comfort. The results of the project will also contribute to the annual energy saving objective of Article 4 of Directive 2012/27/EU on energy efficiency. The proposed technological measures will achieve significant energy savings in the public building. (English) | |||||||||||||||
Property / summary: The aim of the project is to modernise building No. 11 operating building in the Institute for the execution of prison sentence Nitra-Chrenová, ensuring the energy efficiency of the building while using it and reducing the energy intensity (actual energy consumption). The above objective will be achieved by improving the thermal and technical properties of building materials, modernising the systems installed in the building in order to reduce the costs of heating, hot water and lighting, improving the quality of packaging contrusions and internal thermal comfort. The results of the project will also contribute to the annual energy saving objective of Article 4 of Directive 2012/27/EU on energy efficiency. The proposed technological measures will achieve significant energy savings in the public building. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to modernise building No. 11 operating building in the Institute for the execution of prison sentence Nitra-Chrenová, ensuring the energy efficiency of the building while using it and reducing the energy intensity (actual energy consumption). The above objective will be achieved by improving the thermal and technical properties of building materials, modernising the systems installed in the building in order to reduce the costs of heating, hot water and lighting, improving the quality of packaging contrusions and internal thermal comfort. The results of the project will also contribute to the annual energy saving objective of Article 4 of Directive 2012/27/EU on energy efficiency. The proposed technological measures will achieve significant energy savings in the public building. (English) / qualifier | |||||||||||||||
point in time: 15 September 2021
|
Revision as of 13:43, 15 September 2021
Project Q3103276 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3103276 in Slovakia |
Statements
360,639.73 Euro
0 references
424,282.03 Euro
0 references
0.85 percent
0 references
1 March 2017
0 references
1 September 2020
0 references
Ústav na výkon trestu odňatia slobody
0 references
Ciežom projektu je dosiahnu modernizáciu objektu č. 11 prevádzková budova v Ústave na výkon trestu odňatia slobody Nitra-Chrenová, zabezpečujúcu energetickú efektívnos budovy pri jej uívaní a zníenie energetickej náročnosti (skutočnej spotreby energie). Uvedený ciež bude dosiahnutý formou zlepovania tepelno-technických vlastností stavebných materiálov, modernizáciou systémov intalovaných v budove za účelom zníenia nákladov na vykurovanie, prípravu teplej vody a osvetlenie, zlepenia kvality obalových kontrukcií a vnútornej tepelnej pohody. Výsledky projektu budú zároveň prispieva k plneniu ročného cieža úspory energie podža čl. 4 smernice 2012/27/EÚ o energetickej efektívnosti. Navrhovanými technologickými opatreniami sa dosiahne výrazná úspora potreby energie verejnej budovy. (Slovak)
0 references
The aim of the project is to modernise building No. 11 operating building in the Institute for the execution of prison sentence Nitra-Chrenová, ensuring the energy efficiency of the building while using it and reducing the energy intensity (actual energy consumption). The above objective will be achieved by improving the thermal and technical properties of building materials, modernising the systems installed in the building in order to reduce the costs of heating, hot water and lighting, improving the quality of packaging contrusions and internal thermal comfort. The results of the project will also contribute to the annual energy saving objective of Article 4 of Directive 2012/27/EU on energy efficiency. The proposed technological measures will achieve significant energy savings in the public building. (English)
15 September 2021
0 references
Identifiers
310041K174
0 references