(Created claim: summary (P836): The aim of the project to undo the ENERGY NATIONAL BUDING M Partizánska 20 A 22, is reconstructing and modernising the building, improving the protection of building contractions from external influences (see, wind, snow). The implementation of the project will ensure that energy consumption is reduced and that the budget of the city is not increased. This will significantly improve the working environment for employees and cats. The implementat...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project to undo the ENERGY NATIONAL BUDING M Partizánska 20 A 22, is reconstructing and modernising the building, improving the protection of building contractions from external influences (see, wind, snow). The implementation of the project will ensure that energy consumption is reduced and that the budget of the city is not increased. This will significantly improve the working environment for employees and cats. The implementation of the project will consist of four measures, which have been designed as the optimal combination of measures of a construction nature, measures within the modernisation of the distribution and hot water system and, last but not least, modernisation of lighting and installation of air conditioning with heat recovery. The design of the measures for the processing of the project documentation was based on the results of the baseline energy audit, which was a recommendation for the scope of the project documentation processing. At the same time, at this stage of the preparation of the project documentation, high emphasis was also placed on the indicator, Value for Money. This is the final indicator in the project, we can say that the measure of quality of the whole project. Indicator, Value for money is determined by the ratio of the value of the measurement indicator in the project, i.e. the reduction of energy needs in the building in question and the financial resources spent. Expresses the contribution of the project in proportion to the financial resources deployed. (English) | |||||||||||||||
Property / summary: The aim of the project to undo the ENERGY NATIONAL BUDING M Partizánska 20 A 22, is reconstructing and modernising the building, improving the protection of building contractions from external influences (see, wind, snow). The implementation of the project will ensure that energy consumption is reduced and that the budget of the city is not increased. This will significantly improve the working environment for employees and cats. The implementation of the project will consist of four measures, which have been designed as the optimal combination of measures of a construction nature, measures within the modernisation of the distribution and hot water system and, last but not least, modernisation of lighting and installation of air conditioning with heat recovery. The design of the measures for the processing of the project documentation was based on the results of the baseline energy audit, which was a recommendation for the scope of the project documentation processing. At the same time, at this stage of the preparation of the project documentation, high emphasis was also placed on the indicator, Value for Money. This is the final indicator in the project, we can say that the measure of quality of the whole project. Indicator, Value for money is determined by the ratio of the value of the measurement indicator in the project, i.e. the reduction of energy needs in the building in question and the financial resources spent. Expresses the contribution of the project in proportion to the financial resources deployed. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project to undo the ENERGY NATIONAL BUDING M Partizánska 20 A 22, is reconstructing and modernising the building, improving the protection of building contractions from external influences (see, wind, snow). The implementation of the project will ensure that energy consumption is reduced and that the budget of the city is not increased. This will significantly improve the working environment for employees and cats. The implementation of the project will consist of four measures, which have been designed as the optimal combination of measures of a construction nature, measures within the modernisation of the distribution and hot water system and, last but not least, modernisation of lighting and installation of air conditioning with heat recovery. The design of the measures for the processing of the project documentation was based on the results of the baseline energy audit, which was a recommendation for the scope of the project documentation processing. At the same time, at this stage of the preparation of the project documentation, high emphasis was also placed on the indicator, Value for Money. This is the final indicator in the project, we can say that the measure of quality of the whole project. Indicator, Value for money is determined by the ratio of the value of the measurement indicator in the project, i.e. the reduction of energy needs in the building in question and the financial resources spent. Expresses the contribution of the project in proportion to the financial resources deployed. (English) / qualifier | |||||||||||||||
point in time: 15 September 2021
|
Revision as of 13:29, 15 September 2021
Project Q3102963 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3102963 in Slovakia |
Statements
767,684.09 Euro
0 references
903,157.75 Euro
0 references
0.85 percent
0 references
1 April 2017
0 references
1 February 2021
0 references
Mesto Humenné
0 references
Ciežom projektu ZNÍENIE ENERGETICKEJ NÁROČNOSTI BUDOVY M PARTIZÁNSKA 20 A 22, HUMENNÉ je rekontrukcia a modernizácia budovy, zlepenie ochrany stavebných kontrukcií pred vonkajími vplyvmi (dáď, vietor, sneh). Realizácia projektu zabezpečí zníenie spotreby energie a nenavyovanie finančného zaaovania rozpočtu mesta. Dôjde tak ku výraznému zlepeniu pracovného prostredia pre zamestnancov a iakov. Realizácia projektu bude pozostáva zo tyroch opatrení, ktoré boli navrhnuté ako optimálna kombinácia opatrení stavebného charakteru, opatrení v rámci modernizácie systému rozvodov a prípravy teplej vody a v neposlednom rade aj modernizácie osvetlenia a intalácie vzduchotechniky so spätným získavaním tepla. Pri návrhu opatrení na spracovanie projektovej dokumentácie sa vychádzalo z výsledkov východiskového energetického auditu, ktorý mal pre rozsah spracovania projektovej dokumentácie odporúčací charakter. Zároveň sa u v tejto fáze prípravy projektovej dokumentácie kládol vysoký dôraz aj na ukazovatež ,,Value for Money. Ten je výsledným ukazovatežom v projekte, môeme poveda, e meradlom kvality celého projektu. Ukazovatež ,,Value for money sa určí pomerom hodnoty meratežného ukazovateža v projekte, t.j. zníenie potreby energie v predmetnej budove a vynaloených finančných zdrojov. Vyjadruje prínos projektu v pomere ku vynaloeným finančným zdrojom. (Slovak)
0 references
The aim of the project to undo the ENERGY NATIONAL BUDING M Partizánska 20 A 22, is reconstructing and modernising the building, improving the protection of building contractions from external influences (see, wind, snow). The implementation of the project will ensure that energy consumption is reduced and that the budget of the city is not increased. This will significantly improve the working environment for employees and cats. The implementation of the project will consist of four measures, which have been designed as the optimal combination of measures of a construction nature, measures within the modernisation of the distribution and hot water system and, last but not least, modernisation of lighting and installation of air conditioning with heat recovery. The design of the measures for the processing of the project documentation was based on the results of the baseline energy audit, which was a recommendation for the scope of the project documentation processing. At the same time, at this stage of the preparation of the project documentation, high emphasis was also placed on the indicator, Value for Money. This is the final indicator in the project, we can say that the measure of quality of the whole project. Indicator, Value for money is determined by the ratio of the value of the measurement indicator in the project, i.e. the reduction of energy needs in the building in question and the financial resources spent. Expresses the contribution of the project in proportion to the financial resources deployed. (English)
15 September 2021
0 references
Identifiers
310041K294
0 references