Streamlining the public lighting system of Sacueni (Q2745497): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The general objective/purpose of the project is to streamline and modernise the public lighting system at Săcueni level by reducing energy consumption and reducing CO2 emissions from the locality. The objective will be achieved by carrying out the following category A, B, C and E activities: installation of the remote management system, replacing the existing luminaires, installing photovoltaic panels and expanding the public lighting system. Th...)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q2756627 / rank
 
Normal rank

Revision as of 15:12, 23 September 2021

Project Q2745497 in Romania
Language Label Description Also known as
English
Streamlining the public lighting system of Sacueni
Project Q2745497 in Romania

    Statements

    0 references
    6,206,846.8 Romanian Leu
    0 references
    1,241,369.36 Euro
    13 September 2021
    0 references
    7,302,172.7 Romanian Leu
    0 references
    1,460,434.54 Euro
    13 September 2021
    0 references
    0.85 percent
    0 references
    1 June 2017
    0 references
    31 March 2022
    0 references
    ORAS SACUENI
    0 references
    0 references
    Obiectivul general/ scopul proiectului este reprezentat de eficientizarea și modernizarea sistemului de iluminat public de la nivelul orașului Săcueni prin scăderea consumului de energie și prin reducerea emisiilor de CO2 de la nivelul localității. Obiectivul va fi îndeplinit prin realizarea următoarelor activități din categoriile A, B, C și E: instalarea sistemului de telegestiune, prin înlocuirea corpurilor de iluminat existente, prin instalare panouri fotovoltaice și prin extinderea sistemului de iluminat public. Prezentul proiect contribuie la atingerea obiectivelor apelului de proiecte POR/300/3/1, Obiectiv Specific 3.1.C prin următoarele activități: număr de corpuri de iluminat instalate prin proiect de 1042 becuri LED, extinderea/ modernizarea sistemului de iluminat public pe o lungime de 46.266,47 ml și instalarea sistemului de telegestiune punct cu punct. (Romanian)
    0 references
    The general objective/purpose of the project is to streamline and modernise the public lighting system at Săcueni level by reducing energy consumption and reducing CO2 emissions from the locality. The objective will be achieved by carrying out the following category A, B, C and E activities: installation of the remote management system, replacing the existing luminaires, installing photovoltaic panels and expanding the public lighting system. This project contributes to the objectives of the call for projects POR/300/3/1, Specific Objective 3.1.C through the following activities: number of lighting fixtures installed by project of 1042 LED bulbs, extension/modernisation of the public lighting system over a length of 46266,47 ml and installation of the point-by-point remote management system. (English)
    14 September 2021
    0 references
    Oraş Săcueni, Romania
    0 references

    Identifiers

    125280
    0 references