Q3101321 (Q3101321): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Created claim: summary (P836): The aim of the project is to reduce the flood threat of the inhabitants of the village źubica and the town of Kemark by implementing flood measures within the framework of Activity 1 Providing flood protection through the construction of 6 flowing dry halves on 5 streams in the źubica river basin in the former Javorina district, where he is the manager of the flow. The task of half-drugs will be to lurk water in particular in times of extreme ra...)
Property / summary
 
The aim of the project is to reduce the flood threat of the inhabitants of the village źubica and the town of Kemark by implementing flood measures within the framework of Activity 1 Providing flood protection through the construction of 6 flowing dry halves on 5 streams in the źubica river basin in the former Javorina district, where he is the manager of the flow. The task of half-drugs will be to lurk water in particular in times of extreme rainfall and transform the flood wave with the aim of achieving the protection of 119 inhabitants in the geographical areas of źubica- źubica and źubica Kemarok with an existing potentially significant flood risk. At the same time, asset protection of EUR 10 million would be achieved.  The flood protection measures implemented will also contribute to the flooding of water in the country, to reducing the risk of erosion, to stabilising the watercourse as well as to improving the economic utility of the area from the need to manage grassland and forest land. (English)
Property / summary: The aim of the project is to reduce the flood threat of the inhabitants of the village źubica and the town of Kemark by implementing flood measures within the framework of Activity 1 Providing flood protection through the construction of 6 flowing dry halves on 5 streams in the źubica river basin in the former Javorina district, where he is the manager of the flow. The task of half-drugs will be to lurk water in particular in times of extreme rainfall and transform the flood wave with the aim of achieving the protection of 119 inhabitants in the geographical areas of źubica- źubica and źubica Kemarok with an existing potentially significant flood risk. At the same time, asset protection of EUR 10 million would be achieved.  The flood protection measures implemented will also contribute to the flooding of water in the country, to reducing the risk of erosion, to stabilising the watercourse as well as to improving the economic utility of the area from the need to manage grassland and forest land. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to reduce the flood threat of the inhabitants of the village źubica and the town of Kemark by implementing flood measures within the framework of Activity 1 Providing flood protection through the construction of 6 flowing dry halves on 5 streams in the źubica river basin in the former Javorina district, where he is the manager of the flow. The task of half-drugs will be to lurk water in particular in times of extreme rainfall and transform the flood wave with the aim of achieving the protection of 119 inhabitants in the geographical areas of źubica- źubica and źubica Kemarok with an existing potentially significant flood risk. At the same time, asset protection of EUR 10 million would be achieved.  The flood protection measures implemented will also contribute to the flooding of water in the country, to reducing the risk of erosion, to stabilising the watercourse as well as to improving the economic utility of the area from the need to manage grassland and forest land. (English) / qualifier
 
point in time: 15 September 2021
Timestamp+2021-09-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:20, 15 September 2021

Project Q3101321 in Slovakia
Language Label Description Also known as
English
No label defined
Project Q3101321 in Slovakia

    Statements

    0 references
    8,150,334.43 Euro
    0 references
    9,588,628.74 Euro
    0 references
    0.85 percent
    0 references
    1 December 2016
    0 references
    1 November 2022
    0 references
    Vojenské lesy a majetky SR - štátny podnik
    0 references
    0 references

    48°25'9.88"N, 19°9'35.46"E
    0 references
    Ciežom projektu žiadateža VLM SR, š.p je zníži povodňové ohrozenie obyvatežov obce źubica a mesta  Kežmarku realizáciou protipovodňových opatrení v rámci Aktivity 1 – Zabezpečenie  protipovodňovej ochrany   prostredníctvom  výstavby 6 prietočných suchých  poldrov  na 5 tokoch  v povodí toku źubica v bývalom Vojenskom obvode Javorina, kde je žiadatež správcom tokov. Úlohou poldrov bude  zadržiavanie prívalových vôd v hlavne v čase mimoriadnych zrážok a transformácia povodňovej vlny s ciežom dosiahnutia ochrany 119 obyvatežov v geografických oblastiach źubica- źubica a źubica – Kežmarok s existujúcim potenciálne významným povodňovým rizikom. Zároveň by mala by dosiahnutá ochrana majetku v hodnote 10 mil.€.  Realizované protipovodňové opatrenia prispejú taktiež  k zadržiavaniu vody v krajine, k  znižovania rizika erózie, k stabilizácii vodného toku  ako aj  k zlepšeniu  hospodárskej využitežnosti územia z pohžadu obhospodarovania trávnatých a lesných pozemkov. (Slovak)
    0 references
    The aim of the project is to reduce the flood threat of the inhabitants of the village źubica and the town of Kemark by implementing flood measures within the framework of Activity 1 Providing flood protection through the construction of 6 flowing dry halves on 5 streams in the źubica river basin in the former Javorina district, where he is the manager of the flow. The task of half-drugs will be to lurk water in particular in times of extreme rainfall and transform the flood wave with the aim of achieving the protection of 119 inhabitants in the geographical areas of źubica- źubica and źubica Kemarok with an existing potentially significant flood risk. At the same time, asset protection of EUR 10 million would be achieved.  The flood protection measures implemented will also contribute to the flooding of water in the country, to reducing the risk of erosion, to stabilising the watercourse as well as to improving the economic utility of the area from the need to manage grassland and forest land. (English)
    15 September 2021
    0 references

    Identifiers

    310021M076
    0 references