Q3101176 (Q3101176): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: import item from Slovakia)
(‎Created claim: summary (P836): The project riei modernisation and reconstruction of heat distribution in 2 existing standalone efficient systems/circuits of CZT in Preov. By reconstructing and optimising primary heat distributions of CK Jazdecká and CK Sekčov, heat distribution systems adapt to the reduced demand for useful heat and create the prerequisites for reducing primary energy consumption.  They will reduce the heat losses arising from the distribution system, which w...)
Property / summary
 
The project riei modernisation and reconstruction of heat distribution in 2 existing standalone efficient systems/circuits of CZT in Preov. By reconstructing and optimising primary heat distributions of CK Jazdecká and CK Sekčov, heat distribution systems adapt to the reduced demand for useful heat and create the prerequisites for reducing primary energy consumption.  They will reduce the heat losses arising from the distribution system, which will be reflected in the need for heat production. The main objective of the project is to develop efficient district heating systems based on the demand for useful heat. The specific objective of the project is to reduce heat loss and save PEZ in the CZT systems in Preov by reconstructing and modernising part of the primary distribution of CK Jazdecká and CK Sekčov. The project will be implemented through 1 main activity of reconstruction and modernisation of 2 separate CZT circuits in Preov – CK Jazdecká and CK Sekčov. It will implement 3 buildings for which separate building permits have been issued in two stages. Stage:  2018 – reconstruction of primary heating circuit CK Jazdecká, Preovetapa:  2018-2019 – The transition of the primary pipe DN500 on the circuit CK Sekčov, Preov and reconstruction of the primary heating circuit CK Sekčov, Preov Based on the energy audit, the potential for heat savings was determined by reducing heat loss of heat distribution as well as savings of primary energy sources – the average annual distribution loss decreases by 14 913 GJ (4142,638 MWh/year), which represents a 30 % saving. The project also has significant environmental benefits in reducing emissions. The project will achieve the following measurement ukazovatele:Počet district heating systems with high efficiency: 2 Saving of PEZs in district heating systems: 14 913 GJ/r, 4142,638 MWh/rEstimated annual greenhouse gas emission reductions: 1127 t/year (English)
Property / summary: The project riei modernisation and reconstruction of heat distribution in 2 existing standalone efficient systems/circuits of CZT in Preov. By reconstructing and optimising primary heat distributions of CK Jazdecká and CK Sekčov, heat distribution systems adapt to the reduced demand for useful heat and create the prerequisites for reducing primary energy consumption.  They will reduce the heat losses arising from the distribution system, which will be reflected in the need for heat production. The main objective of the project is to develop efficient district heating systems based on the demand for useful heat. The specific objective of the project is to reduce heat loss and save PEZ in the CZT systems in Preov by reconstructing and modernising part of the primary distribution of CK Jazdecká and CK Sekčov. The project will be implemented through 1 main activity of reconstruction and modernisation of 2 separate CZT circuits in Preov – CK Jazdecká and CK Sekčov. It will implement 3 buildings for which separate building permits have been issued in two stages. Stage:  2018 – reconstruction of primary heating circuit CK Jazdecká, Preovetapa:  2018-2019 – The transition of the primary pipe DN500 on the circuit CK Sekčov, Preov and reconstruction of the primary heating circuit CK Sekčov, Preov Based on the energy audit, the potential for heat savings was determined by reducing heat loss of heat distribution as well as savings of primary energy sources – the average annual distribution loss decreases by 14 913 GJ (4142,638 MWh/year), which represents a 30 % saving. The project also has significant environmental benefits in reducing emissions. The project will achieve the following measurement ukazovatele:Počet district heating systems with high efficiency: 2 Saving of PEZs in district heating systems: 14 913 GJ/r, 4142,638 MWh/rEstimated annual greenhouse gas emission reductions: 1127 t/year (English) / rank
 
Normal rank
Property / summary: The project riei modernisation and reconstruction of heat distribution in 2 existing standalone efficient systems/circuits of CZT in Preov. By reconstructing and optimising primary heat distributions of CK Jazdecká and CK Sekčov, heat distribution systems adapt to the reduced demand for useful heat and create the prerequisites for reducing primary energy consumption.  They will reduce the heat losses arising from the distribution system, which will be reflected in the need for heat production. The main objective of the project is to develop efficient district heating systems based on the demand for useful heat. The specific objective of the project is to reduce heat loss and save PEZ in the CZT systems in Preov by reconstructing and modernising part of the primary distribution of CK Jazdecká and CK Sekčov. The project will be implemented through 1 main activity of reconstruction and modernisation of 2 separate CZT circuits in Preov – CK Jazdecká and CK Sekčov. It will implement 3 buildings for which separate building permits have been issued in two stages. Stage:  2018 – reconstruction of primary heating circuit CK Jazdecká, Preovetapa:  2018-2019 – The transition of the primary pipe DN500 on the circuit CK Sekčov, Preov and reconstruction of the primary heating circuit CK Sekčov, Preov Based on the energy audit, the potential for heat savings was determined by reducing heat loss of heat distribution as well as savings of primary energy sources – the average annual distribution loss decreases by 14 913 GJ (4142,638 MWh/year), which represents a 30 % saving. The project also has significant environmental benefits in reducing emissions. The project will achieve the following measurement ukazovatele:Počet district heating systems with high efficiency: 2 Saving of PEZs in district heating systems: 14 913 GJ/r, 4142,638 MWh/rEstimated annual greenhouse gas emission reductions: 1127 t/year (English) / qualifier
 
point in time: 15 September 2021
Timestamp+2021-09-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:15, 15 September 2021

Project Q3101176 in Slovakia
Language Label Description Also known as
English
No label defined
Project Q3101176 in Slovakia

    Statements

    0 references
    2,393,403.96 Euro
    0 references
    2,815,769.37 Euro
    0 references
    0.85 percent
    0 references
    1 May 2019
    0 references
    1 January 2021
    0 references
    SPRAVBYTKOMFORT, a.s. Prešov
    0 references

    48°59'9.60"N, 21°15'8.14"E
    0 references
    Projekt rieši modernizáciu a rekonštrukciu rozvodov tepla v 2 existujúcich samostatných účinných systémoch/okruhoch CZT v Prešove. Rekonštrukciou a optimalizáciou primárnych rozvodov tepla CK Jazdecká a CK Sekčov sa rozvody tepla prispôsobia zníženému dopytu po využitežnom teple a vytvoria sa predpoklady na zníženie spotreby primárnej energie.  Znížia straty tepla vznikajúce v rozvodoch, čo sa prejaví v nižšej potrebe výroby tepla. Hlavným ciežom projektu je rozvoj účinnejších systémov centralizovaného zásobovania teplom založených na dopyte po využitežnom teple. Špecifickým ciežom projektu je zníženie strát tepla a úspora PEZ v systémoch CZT v meste Prešov prostredníctvom rekonštrukcie a modernizácie časti primárnych rozvodov CK Jazdecká a CK Sekčov. Projekt bude realizovaný prostredníctvom 1 hlavnej aktivity „Rekonštrukcia a modernizácia 2 samostatných okruhov CZT v meste Prešov - CK Jazdecká a CK Sekčov“. V rámci nej sa budú realizova 3 stavby, na ktoré boli vydané samostatné stavebné povolenia a to v dvoch etapách.etapa:  2018 - Rekonštrukcia primárneho vykurovacieho okruhu CK Jazdecká, Prešovetapa:  2018-2019 - Preložka primárneho potrubia DN500 na okruhu CK Sekčov, Prešov a Rekonštrukcia primárneho vykurovacieho okruhu CK Sekčov, PrešovNa základe energetického auditu bol stanovený potenciál úspor tepla znížením tepelných strát rozvodov tepla ako aj úspor primárnych energetických zdrojov  - priemerná ročná strata rozvodov sa zníži o 14 913 GJ (4 142,638 MWh/rok), čo predstavuje približne 30 % úsporu. Projekt má aj výrazné environmentálne prínosy v znížení emisií.Projektom budú dosiahnuté nasledovné meratežné ukazovatele:Počet systémov centralizovaného zásobovania teplom s vyššou účinnosou: 2 Úspora PEZ v systémoch centralizovaného zásobovania teplom: 14 913 GJ/r, 4 142,638 MWh/rOdhadované ročné zníženie emisií skleníkových plynov: 1 127 t/rok (Slovak)
    0 references
    The project riei modernisation and reconstruction of heat distribution in 2 existing standalone efficient systems/circuits of CZT in Preov. By reconstructing and optimising primary heat distributions of CK Jazdecká and CK Sekčov, heat distribution systems adapt to the reduced demand for useful heat and create the prerequisites for reducing primary energy consumption.  They will reduce the heat losses arising from the distribution system, which will be reflected in the need for heat production. The main objective of the project is to develop efficient district heating systems based on the demand for useful heat. The specific objective of the project is to reduce heat loss and save PEZ in the CZT systems in Preov by reconstructing and modernising part of the primary distribution of CK Jazdecká and CK Sekčov. The project will be implemented through 1 main activity of reconstruction and modernisation of 2 separate CZT circuits in Preov – CK Jazdecká and CK Sekčov. It will implement 3 buildings for which separate building permits have been issued in two stages. Stage:  2018 – reconstruction of primary heating circuit CK Jazdecká, Preovetapa:  2018-2019 – The transition of the primary pipe DN500 on the circuit CK Sekčov, Preov and reconstruction of the primary heating circuit CK Sekčov, Preov Based on the energy audit, the potential for heat savings was determined by reducing heat loss of heat distribution as well as savings of primary energy sources – the average annual distribution loss decreases by 14 913 GJ (4142,638 MWh/year), which represents a 30 % saving. The project also has significant environmental benefits in reducing emissions. The project will achieve the following measurement ukazovatele:Počet district heating systems with high efficiency: 2 Saving of PEZs in district heating systems: 14 913 GJ/r, 4142,638 MWh/rEstimated annual greenhouse gas emission reductions: 1127 t/year (English)
    15 September 2021
    0 references

    Identifiers

    310041I329
    0 references