(Changed an Item: import item from Slovakia) |
(Created claim: summary (P836): The project riei modernisation and reconstruction of heat distribution in 2 existing standalone efficient systems/circuits of CZT in Preov. By reconstructing and optimising primary heat distributions of CK Jazdecká and CK Sekčov, heat distribution systems adapt to the reduced demand for useful heat and create the prerequisites for reducing primary energy consumption. They will reduce the heat losses arising from the distribution system, which w...) |
||||||||||||||
Property / summary | |||||||||||||||
The project riei modernisation and reconstruction of heat distribution in 2 existing standalone efficient systems/circuits of CZT in Preov. By reconstructing and optimising primary heat distributions of CK Jazdecká and CK Sekčov, heat distribution systems adapt to the reduced demand for useful heat and create the prerequisites for reducing primary energy consumption. They will reduce the heat losses arising from the distribution system, which will be reflected in the need for heat production. The main objective of the project is to develop efficient district heating systems based on the demand for useful heat. The specific objective of the project is to reduce heat loss and save PEZ in the CZT systems in Preov by reconstructing and modernising part of the primary distribution of CK Jazdecká and CK Sekčov. The project will be implemented through 1 main activity of reconstruction and modernisation of 2 separate CZT circuits in Preov – CK Jazdecká and CK Sekčov. It will implement 3 buildings for which separate building permits have been issued in two stages. Stage: 2018 – reconstruction of primary heating circuit CK Jazdecká, Preovetapa: 2018-2019 – The transition of the primary pipe DN500 on the circuit CK Sekčov, Preov and reconstruction of the primary heating circuit CK Sekčov, Preov Based on the energy audit, the potential for heat savings was determined by reducing heat loss of heat distribution as well as savings of primary energy sources – the average annual distribution loss decreases by 14 913 GJ (4142,638 MWh/year), which represents a 30 % saving. The project also has significant environmental benefits in reducing emissions. The project will achieve the following measurement ukazovatele:Počet district heating systems with high efficiency: 2 Saving of PEZs in district heating systems: 14 913 GJ/r, 4142,638 MWh/rEstimated annual greenhouse gas emission reductions: 1127 t/year (English) | |||||||||||||||
Property / summary: The project riei modernisation and reconstruction of heat distribution in 2 existing standalone efficient systems/circuits of CZT in Preov. By reconstructing and optimising primary heat distributions of CK Jazdecká and CK Sekčov, heat distribution systems adapt to the reduced demand for useful heat and create the prerequisites for reducing primary energy consumption. They will reduce the heat losses arising from the distribution system, which will be reflected in the need for heat production. The main objective of the project is to develop efficient district heating systems based on the demand for useful heat. The specific objective of the project is to reduce heat loss and save PEZ in the CZT systems in Preov by reconstructing and modernising part of the primary distribution of CK Jazdecká and CK Sekčov. The project will be implemented through 1 main activity of reconstruction and modernisation of 2 separate CZT circuits in Preov – CK Jazdecká and CK Sekčov. It will implement 3 buildings for which separate building permits have been issued in two stages. Stage: 2018 – reconstruction of primary heating circuit CK Jazdecká, Preovetapa: 2018-2019 – The transition of the primary pipe DN500 on the circuit CK Sekčov, Preov and reconstruction of the primary heating circuit CK Sekčov, Preov Based on the energy audit, the potential for heat savings was determined by reducing heat loss of heat distribution as well as savings of primary energy sources – the average annual distribution loss decreases by 14 913 GJ (4142,638 MWh/year), which represents a 30 % saving. The project also has significant environmental benefits in reducing emissions. The project will achieve the following measurement ukazovatele:Počet district heating systems with high efficiency: 2 Saving of PEZs in district heating systems: 14 913 GJ/r, 4142,638 MWh/rEstimated annual greenhouse gas emission reductions: 1127 t/year (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project riei modernisation and reconstruction of heat distribution in 2 existing standalone efficient systems/circuits of CZT in Preov. By reconstructing and optimising primary heat distributions of CK Jazdecká and CK Sekčov, heat distribution systems adapt to the reduced demand for useful heat and create the prerequisites for reducing primary energy consumption. They will reduce the heat losses arising from the distribution system, which will be reflected in the need for heat production. The main objective of the project is to develop efficient district heating systems based on the demand for useful heat. The specific objective of the project is to reduce heat loss and save PEZ in the CZT systems in Preov by reconstructing and modernising part of the primary distribution of CK Jazdecká and CK Sekčov. The project will be implemented through 1 main activity of reconstruction and modernisation of 2 separate CZT circuits in Preov – CK Jazdecká and CK Sekčov. It will implement 3 buildings for which separate building permits have been issued in two stages. Stage: 2018 – reconstruction of primary heating circuit CK Jazdecká, Preovetapa: 2018-2019 – The transition of the primary pipe DN500 on the circuit CK Sekčov, Preov and reconstruction of the primary heating circuit CK Sekčov, Preov Based on the energy audit, the potential for heat savings was determined by reducing heat loss of heat distribution as well as savings of primary energy sources – the average annual distribution loss decreases by 14 913 GJ (4142,638 MWh/year), which represents a 30 % saving. The project also has significant environmental benefits in reducing emissions. The project will achieve the following measurement ukazovatele:Počet district heating systems with high efficiency: 2 Saving of PEZs in district heating systems: 14 913 GJ/r, 4142,638 MWh/rEstimated annual greenhouse gas emission reductions: 1127 t/year (English) / qualifier | |||||||||||||||
point in time: 15 September 2021
|
Revision as of 13:15, 15 September 2021
Project Q3101176 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3101176 in Slovakia |
Statements
2,393,403.96 Euro
0 references
2,815,769.37 Euro
0 references
0.85 percent
0 references
1 May 2019
0 references
1 January 2021
0 references
SPRAVBYTKOMFORT, a.s. Preov
0 references
Projekt riei modernizáciu a rekontrukciu rozvodov tepla v 2 existujúcich samostatných účinných systémoch/okruhoch CZT v Preove. Rekontrukciou a optimalizáciou primárnych rozvodov tepla CK Jazdecká a CK Sekčov sa rozvody tepla prispôsobia zníenému dopytu po vyuitežnom teple a vytvoria sa predpoklady na zníenie spotreby primárnej energie. Zníia straty tepla vznikajúce v rozvodoch, čo sa prejaví v niej potrebe výroby tepla. Hlavným ciežom projektu je rozvoj účinnejích systémov centralizovaného zásobovania teplom zaloených na dopyte po vyuitežnom teple. pecifickým ciežom projektu je zníenie strát tepla a úspora PEZ v systémoch CZT v meste Preov prostredníctvom rekontrukcie a modernizácie časti primárnych rozvodov CK Jazdecká a CK Sekčov. Projekt bude realizovaný prostredníctvom 1 hlavnej aktivity Rekontrukcia a modernizácia 2 samostatných okruhov CZT v meste Preov - CK Jazdecká a CK Sekčov. V rámci nej sa budú realizova 3 stavby, na ktoré boli vydané samostatné stavebné povolenia a to v dvoch etapách.etapa: 2018 - Rekontrukcia primárneho vykurovacieho okruhu CK Jazdecká, Preovetapa: 2018-2019 - Preloka primárneho potrubia DN500 na okruhu CK Sekčov, Preov a Rekontrukcia primárneho vykurovacieho okruhu CK Sekčov, PreovNa základe energetického auditu bol stanovený potenciál úspor tepla zníením tepelných strát rozvodov tepla ako aj úspor primárnych energetických zdrojov - priemerná ročná strata rozvodov sa zníi o 14 913 GJ (4 142,638 MWh/rok), čo predstavuje pribline 30 % úsporu. Projekt má aj výrazné environmentálne prínosy v zníení emisií.Projektom budú dosiahnuté nasledovné meratežné ukazovatele:Počet systémov centralizovaného zásobovania teplom s vyou účinnosou: 2 Úspora PEZ v systémoch centralizovaného zásobovania teplom: 14 913 GJ/r, 4 142,638 MWh/rOdhadované ročné zníenie emisií skleníkových plynov: 1 127 t/rok (Slovak)
0 references
The project riei modernisation and reconstruction of heat distribution in 2 existing standalone efficient systems/circuits of CZT in Preov. By reconstructing and optimising primary heat distributions of CK Jazdecká and CK Sekčov, heat distribution systems adapt to the reduced demand for useful heat and create the prerequisites for reducing primary energy consumption. They will reduce the heat losses arising from the distribution system, which will be reflected in the need for heat production. The main objective of the project is to develop efficient district heating systems based on the demand for useful heat. The specific objective of the project is to reduce heat loss and save PEZ in the CZT systems in Preov by reconstructing and modernising part of the primary distribution of CK Jazdecká and CK Sekčov. The project will be implemented through 1 main activity of reconstruction and modernisation of 2 separate CZT circuits in Preov – CK Jazdecká and CK Sekčov. It will implement 3 buildings for which separate building permits have been issued in two stages. Stage: 2018 – reconstruction of primary heating circuit CK Jazdecká, Preovetapa: 2018-2019 – The transition of the primary pipe DN500 on the circuit CK Sekčov, Preov and reconstruction of the primary heating circuit CK Sekčov, Preov Based on the energy audit, the potential for heat savings was determined by reducing heat loss of heat distribution as well as savings of primary energy sources – the average annual distribution loss decreases by 14 913 GJ (4142,638 MWh/year), which represents a 30 % saving. The project also has significant environmental benefits in reducing emissions. The project will achieve the following measurement ukazovatele:Počet district heating systems with high efficiency: 2 Saving of PEZs in district heating systems: 14 913 GJ/r, 4142,638 MWh/rEstimated annual greenhouse gas emission reductions: 1127 t/year (English)
15 September 2021
0 references
Identifiers
310041I329
0 references