(‎Created claim: summary (P836): Submitted project solution insulation of the building of the municipal office in eliezovce. It is a brick building with one underground and tyrmi aboveground floors, which is covered with a hipped roof with dormers. In the basement is solved mainly technical background of the building, warehouses. In the above ground floors there are offices, sanitary and social spaces. The building proposes complete insulation of the facade, insulation of the p...)
Property / summary
 
Submitted project solution insulation of the building of the municipal office in eliezovce. It is a brick building with one underground and tyrmi aboveground floors, which is covered with a hipped roof with dormers. In the basement is solved mainly technical background of the building, warehouses. In the above ground floors there are offices, sanitary and social spaces. The building proposes complete insulation of the facade, insulation of the part of the ceiling above the underground floor and thermal insulation of the structure of the building. The object will not change significantly after reconstructing, different will be the color solution of the object. On the west side of the building is designed concrete ramp allowing barrier-free access to the building with anti-lock coating. (English)
Property / summary: Submitted project solution insulation of the building of the municipal office in eliezovce. It is a brick building with one underground and tyrmi aboveground floors, which is covered with a hipped roof with dormers. In the basement is solved mainly technical background of the building, warehouses. In the above ground floors there are offices, sanitary and social spaces. The building proposes complete insulation of the facade, insulation of the part of the ceiling above the underground floor and thermal insulation of the structure of the building. The object will not change significantly after reconstructing, different will be the color solution of the object. On the west side of the building is designed concrete ramp allowing barrier-free access to the building with anti-lock coating. (English) / rank
 
Normal rank
Property / summary: Submitted project solution insulation of the building of the municipal office in eliezovce. It is a brick building with one underground and tyrmi aboveground floors, which is covered with a hipped roof with dormers. In the basement is solved mainly technical background of the building, warehouses. In the above ground floors there are offices, sanitary and social spaces. The building proposes complete insulation of the facade, insulation of the part of the ceiling above the underground floor and thermal insulation of the structure of the building. The object will not change significantly after reconstructing, different will be the color solution of the object. On the west side of the building is designed concrete ramp allowing barrier-free access to the building with anti-lock coating. (English) / qualifier
 
point in time: 15 September 2021
Timestamp+2021-09-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:11, 15 September 2021

Project Q3100676 in Slovakia
Language Label Description Also known as
English
No label defined
Project Q3100676 in Slovakia

    Statements

    0 references
    332,303.53 Euro
    0 references
    390,945.33 Euro
    0 references
    0.85 percent
    0 references
    1 December 2018
    0 references
    1 July 2019
    0 references
    Mesto Želiezovce
    0 references

    48°2'49.52"N, 18°39'16.45"E
    0 references
    Predkladaný projekt rieši zateplenie objektu mestského úradu v Želiezovciach. Jedná sa o murovaný objekt s jedným podzemným a štyrmi nadzemnými podlažiami, ktorý je zastrešený valbovou strechou s vikiermi. V suteréne je riešené prevažne technické zázemie objektu, sklady. V nadzemných podlažiach sa nachádzajú kancelárie, soc.-hygienické a spoločenské priestory. Na objekte sa navrhuje kompletné zateplenie fasády, zateplenie časti stropu nad podzemným podlažím a zateplenie strešnej konštrukcie objektu. Vzhžad objektu sa po vykonaní rekonštrukcie výrazne nezmení, odlišné bude farebné riešenie objektu. Na západnej strane objektu je navrhnutá betónová rampa umožňujúca bezbariérový prístup do objektu s protišmykovou povrchovou úpravou. (Slovak)
    0 references
    Submitted project solution insulation of the building of the municipal office in eliezovce. It is a brick building with one underground and tyrmi aboveground floors, which is covered with a hipped roof with dormers. In the basement is solved mainly technical background of the building, warehouses. In the above ground floors there are offices, sanitary and social spaces. The building proposes complete insulation of the facade, insulation of the part of the ceiling above the underground floor and thermal insulation of the structure of the building. The object will not change significantly after reconstructing, different will be the color solution of the object. On the west side of the building is designed concrete ramp allowing barrier-free access to the building with anti-lock coating. (English)
    15 September 2021
    0 references

    Identifiers

    310041A591
    0 references