Requalification and Modernisation of the Cadaval Basic and Secondary School (Q2871045): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
(‎Removed claim: budget (P474): 217,084.16 euro)
Property / budget
217,084.16 Euro
Amount217,084.16 Euro
UnitEuro
 
Property / budget: 217,084.16 Euro / rank
Normal rank
 

Revision as of 14:29, 21 October 2021

Project Q2871045 in Portugal
Language Label Description Also known as
English
Requalification and Modernisation of the Cadaval Basic and Secondary School
Project Q2871045 in Portugal

    Statements

    0 references
    22 May 2019
    0 references
    31 December 2019
    0 references
    MUNICIPIO DO CADAVAL
    0 references
    0 references

    39°13'18.88"N, 9°7'33.35"W
    0 references
    A operação consiste na requalificação e modernização da Escola B S o Cadaval, a nível de coberturas, pavimentos, vãos e do espaço exterior. Serão intervencionadas as salas de aulas e atividades, o refeitório e cozinha, os laboratórios e a ligação entre os blocos. No exterior serão substituidos alguns pavimentos. O estabelecimento de ensino é o único do concelho que integra os 2º, 3º e secundário, servindo todo o território. (Portuguese)
    0 references
    The operation consists of the requalification and modernisation of School B S or Cadaval, at the level of roofs, floors, spans and of the outer space. Classrooms and activities, the dining room and kitchen, the laboratories and the connection between the blocks will be intervened. On the outside some floors will be replaced. The educational establishment is the only one in the municipality that comprises the 2nd, 3rd and secondary, serving the entire territory. (English)
    7 July 2021
    0 references
    Cadaval, União das freguesias do Cadaval e Pêro Moniz
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000137
    0 references