(‎Removed claim: co-financing rate (P837): 0.4 percent)
Property / co-financing rate
0.4 percent
Amount0.4 percent
Unitpercent
 
Property / co-financing rate: 0.4 percent / rank
Normal rank
 

Revision as of 09:16, 27 September 2021

Project Q3057209 in Latvia
Language Label Description Also known as
English
Reconstruction of the heat supply production source at 14 Latgales Street, Krāslava, installing a new biomass boiler
Project Q3057209 in Latvia

    Statements

    0 references
    0 references
    1,300,020.0 Euro
    0 references
    3,250,050.0 Euro
    0 references
    11 May 2018
    0 references
    10 May 2021
    0 references
    Sabiedrība ar ierobežotu atbildību "Krāslavas nami"
    0 references
    0 references
    0 references

    55°53'40.02"N, 27°10'48.86"E
    0 references
    Projekta mērķis ir samazināt siltumenerģijas zudumus enerģijas ražošanas procesā, ka arī pazemināt elektroenerģijas patēriņu, samazināt kurināmā patēriņu un padarīt sistēmu drošāku, ka ar samazināt ekspluatācijas un uzturēšanas izmaksas.Primārais mērķis tiks panākts izbūvējot katlu 7,5 MW šķeldas pie jau esošās kurināmā padeves pilnībā automatizētai darbībai un mitrā tipa kontakta kondensācijas ekonomaizeri līdz 1,5 MW.Projekta realizēšanai ir pozitīva ietekme uz vidi, jo jaunā katlumāja izmantos videi neitrālo kurināmo – koksni. Savukārt, multiciklonu, elektrofiltru un mitrā tipa ekonomaizers samazinās kurināmā izmešus. Tie tiek novietoti konteineros. Radušos izdedžus var realizēt zemniekiem kā mēslojumu, savukārt, sīkās daļiņas no elektrofiltra, kā bīstamos atkritumus deponēs tuvākā bīstamo atkritumu poligonā.Paredzams, ka projekts tiks īstenots 36 mēnešu laikā no līguma ar CFLA noslēgšanas brīža par KF līdzfinansējuma piesaisti. Projekta kopējās izmaksas ir 4 761 562,96 EUR, no tām KF līdzfinansējums 1 300 020,00 EUR. (Latvian)
    0 references
    The aim of the project is to reduce heat loss in the energy production process, as well as reduce electricity consumption, reduce fuel consumption and make the system safer, that by reducing operating and maintenance costs.Primary goal will be achieved by constructing a boiler in chips with the existing fuel supply for fully automated operation and wet contact condensation economier up to 1.5 MW.The project implementation has a positive impact on the environment, as the new boiler house will use environmentally neutral fuel – wood. Multicyclone, electrofilter and wet economiser, on the other hand, will reduce fuel emissions. They are placed in containers. It is expected that the project will be implemented within 36 months from the date of conclusion of the contract with CF co-financing of the CF.It is expected that the slag can be implemented as a fertiliser, while the small particles from the electro-filter as dangerous waste will be deposited in the nearest landfill. The total cost of the project is EUR 4761562,96, of which CF co-financing EUR 1300020,00. (English)
    15 July 2021
    0 references
    Latgales iela 14, Krāslava, Krāslavas nov., LV-5601
    0 references

    Identifiers

    4.3.1.0/17/A/083