Q3078490 (Q3078490): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes)
(‎Created claim: summary (P836): There is no connection to the public water supply, but there is no connection to the public sewerage system, and therefore there is no proper treatment of waste water. As a result of the project, the property will be merged with the public sewerage system, thereby reducing environmental damage., translated_summary)
Property / summary
 
There is no connection to the public water supply, but there is no connection to the public sewerage system, and therefore there is no proper treatment of waste water. As a result of the project, the property will be merged with the public sewerage system, thereby reducing environmental damage. (English)
Property / summary: There is no connection to the public water supply, but there is no connection to the public sewerage system, and therefore there is no proper treatment of waste water. As a result of the project, the property will be merged with the public sewerage system, thereby reducing environmental damage. (English) / rank
 
Normal rank
Property / summary: There is no connection to the public water supply, but there is no connection to the public sewerage system, and therefore there is no proper treatment of waste water. As a result of the project, the property will be merged with the public sewerage system, thereby reducing environmental damage. (English) / qualifier
 
point in time: 16 August 2021
Timestamp+2021-08-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:07, 16 August 2021

Project Q3078490 in Estonia
Language Label Description Also known as
English
No label defined
Project Q3078490 in Estonia

    Statements

    0 references
    2,692.00 Euro
    0 references
    4,079.0 Euro
    0 references
    66.0 percent
    0 references
    19 March 2021
    0 references
    19 September 2021
    0 references
    Ei kuvata
    0 references
    0 references

    57°41'24.29"N, 26°56'56.04"E
    0 references
    66711
    0 references
    Pargi põik 1, Rõuge vald kinnistul on olemas küll liitumine ühisveevärgiga, ent puudub liitumine ühiskanalisatsiooniga, mistõttu puudub reovee nõuetekohane käitlemine. Projekti tulemusel liidetakse kinnistu ühiskanalisatsiooniga ja vähendatakse seeläbi keskkonnakahjusid. (Estonian)
    0 references
    There is no connection to the public water supply, but there is no connection to the public sewerage system, and therefore there is no proper treatment of waste water. As a result of the project, the property will be merged with the public sewerage system, thereby reducing environmental damage. (English)
    16 August 2021
    0 references

    Identifiers

    2014-2020.7.01.21-8069
    0 references