Q3073602 (Q3073602): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes) |
(Created claim: summary (P836): The project ensures the availability of drinking water that meets the quality requirements and the proper collection of waste water as it is currently missing. 24 m water pipelines and 22 m sewer pipelines will be built., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The project ensures the availability of drinking water that meets the quality requirements and the proper collection of waste water as it is currently missing. 24 m water pipelines and 22 m sewer pipelines will be built. (English) | |||||||||||||||
Property / summary: The project ensures the availability of drinking water that meets the quality requirements and the proper collection of waste water as it is currently missing. 24 m water pipelines and 22 m sewer pipelines will be built. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project ensures the availability of drinking water that meets the quality requirements and the proper collection of waste water as it is currently missing. 24 m water pipelines and 22 m sewer pipelines will be built. (English) / qualifier | |||||||||||||||
point in time: 16 August 2021
|
Revision as of 12:55, 16 August 2021
Project Q3073602 in Estonia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3073602 in Estonia |
Statements
3,792.00 Euro
0 references
5,745.0 Euro
0 references
66.01 percent
0 references
6 September 2019
0 references
6 March 2020
0 references
Ei kuvata
0 references
86602
0 references
Projekt tagab kvaliteedinõuetele vastava joogivee kättesaadavuse ja reovee nõuetekohase kokku kogumise, sest hetkel see puudub. Ehitatakse 24 m veetorustikku ja 22 m kanalisatsioonitorustikku. (Estonian)
0 references
The project ensures the availability of drinking water that meets the quality requirements and the proper collection of waste water as it is currently missing. 24 m water pipelines and 22 m sewer pipelines will be built. (English)
16 August 2021
0 references
Identifiers
2014-2020.7.01.18-0255
0 references