(‎Created claim: summary (P836): In the course of the project, connection to the public water supply and sewerage service will be built on the property. As a result of the project, a drinking and sewage pipeline of almost 12 metres will be dug into the main soil and the necessary piping will be installed. The aim is to collect waste water properly and to use the necessary drinking water and drinking water for the residents of the property., translated_summary)
Property / summary
 
In the course of the project, connection to the public water supply and sewerage service will be built on the property. As a result of the project, a drinking and sewage pipeline of almost 12 metres will be dug into the main soil and the necessary piping will be installed. The aim is to collect waste water properly and to use the necessary drinking water and drinking water for the residents of the property. (English)
Property / summary: In the course of the project, connection to the public water supply and sewerage service will be built on the property. As a result of the project, a drinking and sewage pipeline of almost 12 metres will be dug into the main soil and the necessary piping will be installed. The aim is to collect waste water properly and to use the necessary drinking water and drinking water for the residents of the property. (English) / rank
 
Normal rank
Property / summary: In the course of the project, connection to the public water supply and sewerage service will be built on the property. As a result of the project, a drinking and sewage pipeline of almost 12 metres will be dug into the main soil and the necessary piping will be installed. The aim is to collect waste water properly and to use the necessary drinking water and drinking water for the residents of the property. (English) / qualifier
 
point in time: 16 August 2021
Timestamp+2021-08-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:55, 16 August 2021

Project Q3073587 in Estonia
Language Label Description Also known as
English
No label defined
Project Q3073587 in Estonia

    Statements

    0 references
    1,796.00 Euro
    0 references
    2,722.0 Euro
    0 references
    65.98 percent
    0 references
    23 July 2018
    0 references
    6 August 2018
    0 references
    Ei kuvata
    0 references
    0 references

    59°25'50.59"N, 24°47'24.36"E
    0 references
    11416
    0 references
    Projekti käigus rajatakse kinnistule ühiveevärgi ja kanalisatsiooniteenusega liitumine. Projektist tulenevalt kaevatakse ligi 12 meetrine joogi- ning reovee trass peapinnasesse ning paigaldatakse vajaminev torustik. Eesmärgiks on reovee nõuetekohane kokku kogumine ning kinnistu elanikele vajaliku tarbe- ning joogivee kasutamine. (Estonian)
    0 references
    In the course of the project, connection to the public water supply and sewerage service will be built on the property. As a result of the project, a drinking and sewage pipeline of almost 12 metres will be dug into the main soil and the necessary piping will be installed. The aim is to collect waste water properly and to use the necessary drinking water and drinking water for the residents of the property. (English)
    16 August 2021
    0 references