Q3073587 (Q3073587): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes) |
(Created claim: summary (P836): In the course of the project, connection to the public water supply and sewerage service will be built on the property. As a result of the project, a drinking and sewage pipeline of almost 12 metres will be dug into the main soil and the necessary piping will be installed. The aim is to collect waste water properly and to use the necessary drinking water and drinking water for the residents of the property., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
In the course of the project, connection to the public water supply and sewerage service will be built on the property. As a result of the project, a drinking and sewage pipeline of almost 12 metres will be dug into the main soil and the necessary piping will be installed. The aim is to collect waste water properly and to use the necessary drinking water and drinking water for the residents of the property. (English) | |||||||||||||||
Property / summary: In the course of the project, connection to the public water supply and sewerage service will be built on the property. As a result of the project, a drinking and sewage pipeline of almost 12 metres will be dug into the main soil and the necessary piping will be installed. The aim is to collect waste water properly and to use the necessary drinking water and drinking water for the residents of the property. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: In the course of the project, connection to the public water supply and sewerage service will be built on the property. As a result of the project, a drinking and sewage pipeline of almost 12 metres will be dug into the main soil and the necessary piping will be installed. The aim is to collect waste water properly and to use the necessary drinking water and drinking water for the residents of the property. (English) / qualifier | |||||||||||||||
point in time: 16 August 2021
|
Revision as of 12:55, 16 August 2021
Project Q3073587 in Estonia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3073587 in Estonia |
Statements
1,796.00 Euro
0 references
2,722.0 Euro
0 references
65.98 percent
0 references
23 July 2018
0 references
6 August 2018
0 references
Ei kuvata
0 references
11416
0 references
Projekti käigus rajatakse kinnistule ühiveevärgi ja kanalisatsiooniteenusega liitumine. Projektist tulenevalt kaevatakse ligi 12 meetrine joogi- ning reovee trass peapinnasesse ning paigaldatakse vajaminev torustik. Eesmärgiks on reovee nõuetekohane kokku kogumine ning kinnistu elanikele vajaliku tarbe- ning joogivee kasutamine. (Estonian)
0 references
In the course of the project, connection to the public water supply and sewerage service will be built on the property. As a result of the project, a drinking and sewage pipeline of almost 12 metres will be dug into the main soil and the necessary piping will be installed. The aim is to collect waste water properly and to use the necessary drinking water and drinking water for the residents of the property. (English)
16 August 2021
0 references
Identifiers
2014-2020.7.01.18-0201
0 references