Q3073076 (Q3073076): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes)
(‎Created claim: summary (P836): A separate development plan will be prepared for the district heating area of Loo village (separately for Kostivere). A procurement was organised to prepare the development plan, which was won by AF_Consulting AS Quality and Environmental Manager Jüri Kleesmaa. The report shall be completed and handed over to the Contracting Entity by 30 September 2015 at the latest., translated_summary)
Property / summary
 
A separate development plan will be prepared for the district heating area of Loo village (separately for Kostivere). A procurement was organised to prepare the development plan, which was won by AF_Consulting AS Quality and Environmental Manager Jüri Kleesmaa. The report shall be completed and handed over to the Contracting Entity by 30 September 2015 at the latest. (English)
Property / summary: A separate development plan will be prepared for the district heating area of Loo village (separately for Kostivere). A procurement was organised to prepare the development plan, which was won by AF_Consulting AS Quality and Environmental Manager Jüri Kleesmaa. The report shall be completed and handed over to the Contracting Entity by 30 September 2015 at the latest. (English) / rank
 
Normal rank
Property / summary: A separate development plan will be prepared for the district heating area of Loo village (separately for Kostivere). A procurement was organised to prepare the development plan, which was won by AF_Consulting AS Quality and Environmental Manager Jüri Kleesmaa. The report shall be completed and handed over to the Contracting Entity by 30 September 2015 at the latest. (English) / qualifier
 
point in time: 16 August 2021
Timestamp+2021-08-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:47, 16 August 2021

Project Q3073076 in Estonia
Language Label Description Also known as
English
No label defined
Project Q3073076 in Estonia

    Statements

    0 references
    4,158.00 Euro
    0 references
    5,090.4 Euro
    0 references
    81.68 percent
    0 references
    27 July 2015
    0 references
    26 July 2016
    0 references
    Jõelähtme Vallavalitsus
    0 references
    0 references

    59°26'41.86"N, 25°8'4.49"E
    0 references
    74202
    0 references
    Koostatakse eraldi arengukava Loo aleviku kaugküttepiirkonnale (Kostiverele eraldi). Arengukava koostamiseks korraldati hange, mille võitis AF_Consulting AS kvaliteedi- ja keskkonnajuht Jüri Kleesmaa isikus. Aruanne valmib ja antakse Tellijale üle hiljemalt 30. septembriks 2015.a. (Estonian)
    0 references
    A separate development plan will be prepared for the district heating area of Loo village (separately for Kostivere). A procurement was organised to prepare the development plan, which was won by AF_Consulting AS Quality and Environmental Manager Jüri Kleesmaa. The report shall be completed and handed over to the Contracting Entity by 30 September 2015 at the latest. (English)
    16 August 2021
    0 references

    Identifiers

    2014-2020.6.02.003.01.15-0010
    0 references