(Created claim: summary (P836): The project consists of the use of energy-saving lighting solutions which will drastically reduce the installed capacity of equipment while improving the quality and standard of lighting, with a significant impact on road safety and pedestrian safety, which will have a significant impact on road safety and pedestrian safety that are identified to upgrade the light points along with the poles (without changing the location of the lights), replace...) |
||
Property / summary | |||
The project consists of the use of energy-saving lighting solutions which will drastically reduce the installed capacity of equipment while improving the quality and standard of lighting, with a significant impact on road safety and pedestrian safety, which will have a significant impact on road safety and pedestrian safety that are identified to upgrade the light points along with the poles (without changing the location of the lights), replace the current binding sodium frames and the quality of the materials used for their construction considerably deviates from the current solutions. the scope of the design includes more than 25 % of the proportion of lighting points being modernised in relation to all the points of the road lighting property of Szczecinek, 734 of 2760. Within the project, the necessary types of action to implement the investment are: Activity 1 — Development of the project documentation necessary to carry out the investment, together with the project’s financial statement 2 — Development of a feasibility study for investment with a request for financial compensation of 3 — Construction and installation studies linked to the tangible implementation of the investment, including the purchase of building blocks and booms linked to the construction of investments in construction and assembly works, Other work related to the improvement of investment projects is Zadanie 4 — Investment investment by Zadanie 5 — Promotion of project implementation and implementation of the project. The modernised lighting will be in line with the exchange of standard PN-EN 13201: 2007. it now requires road and street lighting requirements. the project will therefore be characterised by compliance with the requirements of existing European and Polish environmental standards and regulations and, indirectly, by reducing the risks to human health, the planned investment will contribute to saving electricity and reducing CO2 emissions of other pollutants while at the same time entering into the EU priorities for climate change adaptation. (English) | |||
Property / summary: The project consists of the use of energy-saving lighting solutions which will drastically reduce the installed capacity of equipment while improving the quality and standard of lighting, with a significant impact on road safety and pedestrian safety, which will have a significant impact on road safety and pedestrian safety that are identified to upgrade the light points along with the poles (without changing the location of the lights), replace the current binding sodium frames and the quality of the materials used for their construction considerably deviates from the current solutions. the scope of the design includes more than 25 % of the proportion of lighting points being modernised in relation to all the points of the road lighting property of Szczecinek, 734 of 2760. Within the project, the necessary types of action to implement the investment are: Activity 1 — Development of the project documentation necessary to carry out the investment, together with the project’s financial statement 2 — Development of a feasibility study for investment with a request for financial compensation of 3 — Construction and installation studies linked to the tangible implementation of the investment, including the purchase of building blocks and booms linked to the construction of investments in construction and assembly works, Other work related to the improvement of investment projects is Zadanie 4 — Investment investment by Zadanie 5 — Promotion of project implementation and implementation of the project. The modernised lighting will be in line with the exchange of standard PN-EN 13201: 2007. it now requires road and street lighting requirements. the project will therefore be characterised by compliance with the requirements of existing European and Polish environmental standards and regulations and, indirectly, by reducing the risks to human health, the planned investment will contribute to saving electricity and reducing CO2 emissions of other pollutants while at the same time entering into the EU priorities for climate change adaptation. (English) / rank | |||
Normal rank |
Revision as of 10:06, 11 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of urban lighting in Szczecinek, in the direction of its energy efficiency |
Project in Poland financed by DG Regio |
Statements
2,064,213.4 zloty
0 references
2,517,568.06 zloty
0 references
82.05 percent
0 references
4 May 2017
0 references
31 July 2018
0 references
MIASTO SZCZECINEK
0 references
Projekt polega na zastosowaniu energooszczędnych rozwiązań oświetlenia pozwalających na radykalne obniżenie mocy zainstalowanych urządzeń przy jednoczesnej poprawie jakości i standardu oświetlenia mającego znaczący wpływ na bezpieczeństwo ruchu kołowego i pieszego Wytypowane do modernizacji punkty świetlne wraz ze słupami (bez zmiany lokalizacji latarń) zastąpią obecne oprawy sodowe Przestarzała konstrukcja opraw oraz jakość zastosowanych do ich budowy materiałów znacznie odbiega od obecnie stosowanych rozwiązań Zakres projektu obejmuje powyżej 25% udziału punktów świetlnych objętych modernizacją w stosunku do wszystkich punktów stanowiących majątek oświetlenia drogowego będącego w eksploatacji Miasta Szczecinek tj 734 z 2760. W ramach projektu niezbędne rodzaje czynności do realizacji inwestycji to: Zadanie 1 – Opracowanie dokumentacji projektowej niezbędnej do przeprowadzenia inwestycji wraz z kosztorysem inwestorskim Zadanie 2 – Opracowanie Studium Wykonalności inwestycji wraz z wnioskiem o dofinansowanie Zadanie 3 – Roboty budowlano-montażowe związane z rzeczową realizacją inwestycji w tym zakup opraw słupów i wysięgników związanych z realizacją inwestycji Roboty budowlano-montażowe Pozostałe prace związane z poprawnym wykonaniem inwestycji to Zadanie 4 – Nadzór inwestorski Zadanie 5 – Działania promocyjne związane z realizacją projektu i wdrożeniem jego efektów. Zmodernizowane oświetlenie będzie spełniało wymiana normy PN-EN 13201:2007 Stanowi ona obecnie wymagania dotyczące oświetlenia dróg i ulic W związku z powyższym projekt będzie charakteryzował się spełnieniem wymogów wynikających z obowiązujących europejskich i polskich norm i przepisów ochrony środowiska a także pośrednio zmniejszeniem zagrożeń dla zdrowia ludzkiego Planowana inwestycja przyczyni się do zaoszczędzenia energii elektrycznej oraz ograniczenia emisji CO2 innych zanieczyszczeń wpisując się jednocześnie w priorytety UE w zakresie działań adaptacyjnych łagodzących zmiany klimatu. (Polish)
0 references
The project consists of the use of energy-saving lighting solutions which will drastically reduce the installed capacity of equipment while improving the quality and standard of lighting, with a significant impact on road safety and pedestrian safety, which will have a significant impact on road safety and pedestrian safety that are identified to upgrade the light points along with the poles (without changing the location of the lights), replace the current binding sodium frames and the quality of the materials used for their construction considerably deviates from the current solutions. the scope of the design includes more than 25 % of the proportion of lighting points being modernised in relation to all the points of the road lighting property of Szczecinek, 734 of 2760. Within the project, the necessary types of action to implement the investment are: Activity 1 — Development of the project documentation necessary to carry out the investment, together with the project’s financial statement 2 — Development of a feasibility study for investment with a request for financial compensation of 3 — Construction and installation studies linked to the tangible implementation of the investment, including the purchase of building blocks and booms linked to the construction of investments in construction and assembly works, Other work related to the improvement of investment projects is Zadanie 4 — Investment investment by Zadanie 5 — Promotion of project implementation and implementation of the project. The modernised lighting will be in line with the exchange of standard PN-EN 13201: 2007. it now requires road and street lighting requirements. the project will therefore be characterised by compliance with the requirements of existing European and Polish environmental standards and regulations and, indirectly, by reducing the risks to human health, the planned investment will contribute to saving electricity and reducing CO2 emissions of other pollutants while at the same time entering into the EU priorities for climate change adaptation. (English)
0 references
Identifiers
RPZP.02.04.00-32-0001/16
0 references