(‎Created claim: summary (P836): The subject of the study is the completion of the thermomodernisation work at the Public Building SP in Good, ul. Horizontal 5, Gmina Dobra, namely: 1) insulation of the flat roof — a stylised roof and a floor with a thickness of 20 cm. The thermal insulation of Attica and its accompanying works have also been taken into account. The insulation surface — 628.60 m² 2) for the insulation of external walls (southwest, south-west, north-west, north-...)
Property / summary
 
The subject of the study is the completion of the thermomodernisation work at the Public Building SP in Good, ul. Horizontal 5, Gmina Dobra, namely: 1) insulation of the flat roof — a stylised roof and a floor with a thickness of 20 cm. The thermal insulation of Attica and its accompanying works have also been taken into account. The insulation surface — 628.60 m² 2) for the insulation of external walls (southwest, south-west, north-west, north-east) — for example, the thermoorganic — façade — Platinum plus (or equivalent) of a thickness of 18 cm 3), the replacement of window frames for the new EI 60 window, the replacement surface of joiners of 4.20 m² 4) the replacement of door joinery on the new EI 60, the replacement area of 3.60 m² of the facility was built in 1964 and, to date, works as a school building. The building has a traditional, non-insulated, non-insulated, non-insulated, single-storey building with a capacity of 1 775.32 m³ and a net area of over 592.20 m². 277 people benefit from the facility. Windows have already been exchanged between windows and doors in the hydroforni and boiler rooms, concrete walls, masonry walls, while the flooring on the ground has a traditional array of layers of the 70s. Annual heating demand for heating of the building (without heating system efficiency and heating interruptions) — 596,29 GJ/year. Thanks to the modernisation work carried out, the heat demand will be saved at 61.29 %, which is above 25 %. This will result in the implementation of activities linked to the deep and comprehensive energy modernisation of an educational establishment that today serves both children and teachers working in the facility. (English)
Property / summary: The subject of the study is the completion of the thermomodernisation work at the Public Building SP in Good, ul. Horizontal 5, Gmina Dobra, namely: 1) insulation of the flat roof — a stylised roof and a floor with a thickness of 20 cm. The thermal insulation of Attica and its accompanying works have also been taken into account. The insulation surface — 628.60 m² 2) for the insulation of external walls (southwest, south-west, north-west, north-east) — for example, the thermoorganic — façade — Platinum plus (or equivalent) of a thickness of 18 cm 3), the replacement of window frames for the new EI 60 window, the replacement surface of joiners of 4.20 m² 4) the replacement of door joinery on the new EI 60, the replacement area of 3.60 m² of the facility was built in 1964 and, to date, works as a school building. The building has a traditional, non-insulated, non-insulated, non-insulated, single-storey building with a capacity of 1 775.32 m³ and a net area of over 592.20 m². 277 people benefit from the facility. Windows have already been exchanged between windows and doors in the hydroforni and boiler rooms, concrete walls, masonry walls, while the flooring on the ground has a traditional array of layers of the 70s. Annual heating demand for heating of the building (without heating system efficiency and heating interruptions) — 596,29 GJ/year. Thanks to the modernisation work carried out, the heat demand will be saved at 61.29 %, which is above 25 %. This will result in the implementation of activities linked to the deep and comprehensive energy modernisation of an educational establishment that today serves both children and teachers working in the facility. (English) / rank
 
Normal rank

Revision as of 10:04, 11 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Energy modernisation of the centre of the Primary School in Good Street at ul. Horizontal 5, Gmina Dobra
Project in Poland financed by DG Regio

    Statements

    0 references
    274,661.99 zloty
    0 references
    65,918.87759999999 Euro
    13 January 2020
    0 references
    342,936.78 zloty
    0 references
    82,304.8272 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    20 July 2016
    0 references
    13 November 2017
    0 references
    GMINA DOBRA
    0 references
    Przedmiotem opracowania jest dokonanie prac termomodernizacyjnych przy budynku Publicznej SP w Dobrej przy ul. Poziomkowej 5,Gmina Dobra, a mianowicie: 1) docieplenie stropodachu – styropianem dach i podłoga o grubości 20 cm. Uwzględniono także docieplenie attyki wraz z pracami towarzyszącymi. Powierzchnia docieplenia – 628,60 m2 2) docieplenie ścian zewnętrznych (południowy -zachód, południowy -wschód, północny-zachód, północny wschód, południowy -wschód) – np. termoorganika – fasada – Platinum plus (lub równoważne) o grubości 18 cm 3) wymiana stolarki okiennej na nową (okno przy hydroforni i kotłowni), na nowe EI 60, powierzchnia wymiany stolarki – 4,20 m2 4) wymiana stolarki drzwiowej na nową (drzwi hydroforni), na nowe EI 60, powierzchnia wymiany – 3,60 m2 Dany obiekt został wybudowany w 1964 r. i do dziś funkcjonuje jako budynek szkolny. Budynek posiada konstrukcję tradycyjną murowaną, nieizolowaną termicznie,jednokondygnacyjną, o kubaturze 1775,32 m3 i powierzchni netto– 592,20 m2. Z obiektu korzysta 277 osób. Okna zostały już wymienione na nowe–pozostało do wymiany okno i drzwi w hydroforni oraz przy kotłowni, ściany fundamentowe betonowe, ściany wewnętrzne murowane, natomiast podłoga na gruncie ma tradycyjny układ warstw z lat 70 ubiegłego wieku. Roczne zapotrzebowanie na ciepło do ogrzewania budynku (bez uwzględnienia sprawności systemu grzewczego i przerw w ogrzewaniu) – 596,29 GJ/rok . Dzięki przeprowadzonym pracom modernizacyjnym oszczędność zapotrzebowania ciepłą wyniesie 61,29 %, czyli powyżej 25% Inwestycja jest etapem szerszego przedsięwzięcia związanego z rozbudową szkoły w Dobrej. Efektem realizacji będzie bowiem wdrożenie działań związanych z głęboką, kompleksową modernizacją energetyczną obiektu oświatowego, który służy dzisiaj zarówno dzieciom jak i nauczycielom pracującym w obiekcie. (Polish)
    0 references
    The subject of the study is the completion of the thermomodernisation work at the Public Building SP in Good, ul. Horizontal 5, Gmina Dobra, namely: 1) insulation of the flat roof — a stylised roof and a floor with a thickness of 20 cm. The thermal insulation of Attica and its accompanying works have also been taken into account. The insulation surface — 628.60 m² 2) for the insulation of external walls (southwest, south-west, north-west, north-east) — for example, the thermoorganic — façade — Platinum plus (or equivalent) of a thickness of 18 cm 3), the replacement of window frames for the new EI 60 window, the replacement surface of joiners of 4.20 m² 4) the replacement of door joinery on the new EI 60, the replacement area of 3.60 m² of the facility was built in 1964 and, to date, works as a school building. The building has a traditional, non-insulated, non-insulated, non-insulated, single-storey building with a capacity of 1 775.32 m³ and a net area of over 592.20 m². 277 people benefit from the facility. Windows have already been exchanged between windows and doors in the hydroforni and boiler rooms, concrete walls, masonry walls, while the flooring on the ground has a traditional array of layers of the 70s. Annual heating demand for heating of the building (without heating system efficiency and heating interruptions) — 596,29 GJ/year. Thanks to the modernisation work carried out, the heat demand will be saved at 61.29 %, which is above 25 %. This will result in the implementation of activities linked to the deep and comprehensive energy modernisation of an educational establishment that today serves both children and teachers working in the facility. (English)
    0 references

    Identifiers

    RPZP.02.06.00-32-A004/16