Q3068024 (Q3068024): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Created claim: summary (P836): With the reconstruction of Gonsiori Street, public transport lanes will be built in both directions, and the average lanes will be a different lane, where traffic will take place in the morning towards the city centre, but in the evening, towards Lasnamäe. The project provides for the installation and reconstruction of a traffic light system on Gonsiori Street. Foot and bicycle paths are being built and reconstructed. Street lighting is bei...)
Property / summary
 
With the reconstruction of Gonsiori Street, public transport lanes will be built in both directions, and the average lanes will be a different lane, where traffic will take place in the morning towards the city centre, but in the evening, towards Lasnamäe. 
The project provides for the installation and reconstruction of a traffic light system on Gonsiori Street. Foot and bicycle paths are being built and reconstructed. Street lighting is being reconstructed. (English)
Property / summary: With the reconstruction of Gonsiori Street, public transport lanes will be built in both directions, and the average lanes will be a different lane, where traffic will take place in the morning towards the city centre, but in the evening, towards Lasnamäe. 
The project provides for the installation and reconstruction of a traffic light system on Gonsiori Street. Foot and bicycle paths are being built and reconstructed. Street lighting is being reconstructed. (English) / rank
 
Normal rank
Property / summary: With the reconstruction of Gonsiori Street, public transport lanes will be built in both directions, and the average lanes will be a different lane, where traffic will take place in the morning towards the city centre, but in the evening, towards Lasnamäe. 
The project provides for the installation and reconstruction of a traffic light system on Gonsiori Street. Foot and bicycle paths are being built and reconstructed. Street lighting is being reconstructed. (English) / qualifier
 
point in time: 16 August 2021
Timestamp+2021-08-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:45, 16 August 2021

Project Q3068024 in Estonia
Language Label Description Also known as
English
No label defined
Project Q3068024 in Estonia

    Statements

    0 references
    5,620,047.71 Euro
    0 references
    6,611,820.83 Euro
    0 references
    85.0 percent
    0 references
    26 September 2016
    0 references
    31 December 2020
    0 references
    Tallinna Keskkonna- ja Kommunaalamet
    0 references
    0 references
    15197
    0 references
    Gonsiori tänava rekonstrueerimisega rajatakse mõlemas sõidusuunas ühissõidukirajad ning keskmine sõidurada on muutsuunaliiklusega sõidurada, kus hommikusel perioodil toimub liiklus suunaga kesklinna poole, õhtul aga vastupidi – suunaga Lasnamäe poole. 
Projektiga nähakse ette valgusfoorisüsteemi paigaldamine ja rekonstrueerimine Gonsiori tänaval. Rajatakse ja rekonstrueeritakse jalg- ja jalgrattateid. Rekonstrueeritakse tänavavalgustus. (Estonian)
    0 references
    With the reconstruction of Gonsiori Street, public transport lanes will be built in both directions, and the average lanes will be a different lane, where traffic will take place in the morning towards the city centre, but in the evening, towards Lasnamäe. 
The project provides for the installation and reconstruction of a traffic light system on Gonsiori Street. Foot and bicycle paths are being built and reconstructed. Street lighting is being reconstructed. (English)
    16 August 2021
    0 references

    Identifiers

    2014-2020.10.02.16-0053
    0 references