Extension of the municipal water supply network in Linowo area – 1st stage from junction No 219 to 301/118; Second stage from no. 301/118 to 179/71 (Q2717371): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed claim: EU contribution (P835): 45,238.33 euro) |
||
Property / EU contribution: 45,238.33 Euro / rank | Property / EU contribution: 45,238.33 Euro / rank | ||
Preferred rank |
Revision as of 00:58, 22 September 2021
Project Q2717371 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension of the municipal water supply network in Linowo area – 1st stage from junction No 219 to 301/118; Second stage from no. 301/118 to 179/71 |
Project Q2717371 in Poland |
Statements
203,501.28 zloty
0 references
239,413.27 zloty
0 references
85.0 percent
0 references
9 June 2017
0 references
18 November 2020
0 references
GMINA DŹWIERZUTY
0 references
Projekt stanowi samodzielną jednostkę analizy i obejmuje wszystkie zadania niezbędne do zapewnienia funkcjonalności i operacyjności infrastruktury zaraz po realizacji zakresu rzeczowego. Dla uruchomienia produktów projektu nie jest wymagana realizacja innych zadań. 1. Lokalizacja a) Rozbudowa gminnej sieci wodociągowej w m. Linowo obręb Linowo – I etap: obejmuje budowę sieci wodociągowej poprzez montaż rurociągów z rur PE SDR17 PN10 o średnicy zewnętrznej 160 mm i długości 423,5. Podłączenie instalacji do sieci wodociągowych - trójniki wbudowane do istniejących rurociągów. Dodatkowo zaplanowano m.in. odtworzenie nawierzchni betonowej, żwirowej oraz ogrodzenia a także montaż hydrantów pożarowych naziemnych. b) Rozbudowa gminnej sieci wodociągowej w m. Linowo obręb Linowo – II etap: obejmuje budowę sieci wodociągowej poprzez montaż rurociągów z rur PE SDR17 PN10 o średnicy zewnętrznej 160 mm i długości 787,5 m. Dodatkowo zaplanowano m.in. odtworzenie nawierzchni żwirowej a także montaż hydrantów pożarowych naziemnych. Wnioskodawcą, Inwestorem i Beneficjentem jest Gmina Dźwierzuty. Zarządzanie projektem w formie zespołu projektowego działającego w oparciu o metodykę PCM i mechanizmy partycypacyjne. Za projekt będzie odpowiedzialny Urząd Gminy w Dźwierzutach. Projekt nie jest duży i nie jest objęty pomocą publiczną. Projekt wpisuje się założenia SZOOP WiM 2014-2020: Działanie 5.2 Gospodarka wodno-ściekowa, OP 5. Środowisko przyrodnicze i racjonalne wykorzystanie zasobów poprzez zwiększenie dostępu do lepszej jakości wody i do zachowania i ochrony środowiska przyrodniczego i efektywnego gospodarowania zasobami. (Polish)
0 references
The project is a stand-alone unit of analysis and covers all tasks necessary to ensure the functionality and operability of the infrastructure as soon as the material scope is completed. Other tasks are not required to launch project products. 1. Location a) Expansion of the municipal water supply network in Linowo – 1st stage: it includes the construction of a water supply network by installing pipelines from PE SDR17 PN10 pipes with an external diameter of 160 mm and a length of 423.5. Connection of the installation to the water supply network – tees built into existing pipelines. In addition, the reconstruction of concrete pavement, gravel pavement and fence as well as the installation of ground fire hydrants are planned. b) Expansion of the municipal water supply network in the Linowo region – II stage: it includes the construction of a water supply network through the installation of pipelines from PE SDR17 PN10 pipes with an external diameter of 160 mm and a length of 787.5 m. In addition, it is planned to reconstruct the gravel surface as well as the installation of ground fire hydrants. The Applicant, Investor and Beneficiary is the Municipality of Dzwierzuty. Project management in the form of a project team operating on the basis of PCM methodology and participatory mechanisms. The project will be under the responsibility of the Municipality Office in Dzwierzuty. The project is not large and does not benefit from state aid. The draft follows the assumptions of the SZOOP WiM 2014-2020: Measure 5.2 Water and wastewater management, OP 5. The natural environment and resource efficiency by increasing access to better water quality and to preserving and protecting the natural environment and resource efficiency. (English)
8 July 2021
0 references
Identifiers
RPWM.05.02.00-28-0005/20
0 references