Investments in RES in Biały Młyn Inn (Q2717303): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed claim: EU contribution (P835): 37,354.1 euro)
Property / EU contribution: 37,354.1 Euro / rankProperty / EU contribution: 37,354.1 Euro / rank
Normal rank
Preferred rank

Revision as of 00:54, 22 September 2021

Project Q2717303 in Poland
Language Label Description Also known as
English
Investments in RES in Biały Młyn Inn
Project Q2717303 in Poland

    Statements

    0 references
    0 references
    168,034.63 zloty
    0 references
    37,354.1 Euro
    0.2223 Euro
    0 references
    197,687.8 zloty
    0 references
    43,946.0 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    10 April 2017
    0 references
    28 February 2021
    0 references
    ZAJAZD BIAŁY MŁYN S.C. JACEK SĘK, ROMINA SĘK
    0 references
    0 references

    53°56'19.3"N, 21°32'38.8"E
    0 references
    PRZEDMIOT PROJEKTU: Budowa 2 instalacji fotowoltaicznych na działce Wnioskodawcy nr 56/3 w obrębie ewidencyjnym STERŁAWKI WIELKIE, w jednostce ewidencyjnej Gmina Ryn (Sterławki Wielkie 22, 11-520 Ryn, pow. giżycki, woj. warmińsko-mazurskie), tj.: 1. posadowionej na gruncie instalacji o mocy o mocy 14,7 kW - panele PV monokrystaliczne 300W w liczbie 49 szt. - instalacja osadzona na konstrukcji stalowej połączonej ze stelażem pod panele PV - inwerter o mocy 15 kW 2. posadowionej na gruncie instalacji o mocy 25,2 kW - panele PV monokrystaliczne 300W w liczbie 84 szt. - instalacja osadzona na konstrukcji stalowej połączonej ze stelażem pod panele PV - inwerter o mocy 20 kW ETAPY REALIZACJI PROJEKTU: - złożenie wniosku o dofinansowanie - podpisanie umowy o dofinansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac budowlanych - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu SPOSÓB WDRAŻANIA PROJEKTU: - wybór wykonawcy zgodnie z zasadą konkurencyjności - podpisanie umowy z wykonawcą - montaż instalacji - zakończenie projektu, podpisanie protokołu końcowego, płatność końcowa Projekt wpisuje się w założenia wpisane w SzOOP RPO WiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. wnioskodawcy, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność regionu. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii. (Polish)
    0 references
    SUBJECT OF THE PROJECT: Construction of 2 photovoltaic installations on the Applicant’s plot No 56/3 within the register of Sterławka WIELKIE, in the register unit of the Municipality of Ryn (Sterławki Wielkie 22, 11-520 Ryn, Giżycki region, Warmińsko-Mazurskie voivodeship), i.e.: 1. planted on the ground with a power of 14.7 kW – PV monocrystalline panels 300 W in the number of 49 pcs. — installation mounted on a steel structure connected to a frame for PV panels – inverter with a power of 15 kW 2. mounted on the ground of an installation with a power of 25.2 kW – PV monocrystalline panels 300 W in the number of 84 pieces. — installation mounted on a steel structure connected with a frame for PV panels – inverter with a power of 20 kW ETAP OF PROJECT REALISATION: — submission of an application for funding – signature of a contract for financing – selection of the contractor in accordance with the principle of competitiveness – conclusion of a contract with the contractor and commencement of construction works – execution of the works in accordance with the planned timetable – completion of the project and signing of the final protocol – final settlement of the project PROJECT PROJECT PROVISIONAL PROVISIONS: — selection of the contractor in accordance with the principle of competitiveness – signing of a contract with the contractor – installation installation – completion of the project, signing of the final protocol, final payment The project is in line with the assumptions entered in the SzOOP ROP WiM in order to achieve the objective of: Increased share of RES in the region’s overall energy balance. The implementation of the sub-measure will increase the share of renewable energy in the energy balance of the applicant, which will increase the share of renewable energy in the energy balance. The region. This will reduce emissions of harmful gases and dusts into the atmosphere and increase the competitiveness of the region through the use of local renewable energy sources. As a result of the investment, the costs associated with energy consumption will decrease. (English)
    8 July 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0384/17
    0 references