Use of photovoltaic installation for the production of electricity for the “GODABA” Company Czesław Gołębiowski (Q2717234): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed claim: EU contribution (P835): 141,207.55 euro)
Property / EU contribution: 141,207.55 Euro / rankProperty / EU contribution: 141,207.55 Euro / rank
Normal rank
Preferred rank

Revision as of 00:47, 22 September 2021

Project Q2717234 in Poland
Language Label Description Also known as
English
Use of photovoltaic installation for the production of electricity for the “GODABA” Company Czesław Gołębiowski
Project Q2717234 in Poland

    Statements

    0 references
    635,211.65 zloty
    0 references
    141,207.55 Euro
    0.2223 Euro
    0 references
    747,307.82 zloty
    0 references
    166,126.53 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    31 December 2018
    0 references
    30 April 2021
    0 references
    CZESŁAW GOŁĘBIOWSKI "GODABA" CZESŁAW GOŁĘBIOWSKI
    0 references
    0 references

    53°42'16.6"N, 20°57'39.2"E
    0 references
    Lokalizacja inwestycji: obiekt żwirowni w Targowie, Gmina Dźwierzuty, powiat szczycieński. działka nr 373/3 (na której planowana jest inwestycja m.in poprzez montaż paneli PV) i działka nr 347/19 (obiekt żwirowni zasilany z paneli PV), obręb nr 16 Targowo. Wnioskodawca jest właścicielem powyższych nieruchomości. Zakres robót budowlanych planowanych do realizacji w ramach inwestycji: 1) Dostawa konstrukcji wsporczych wbijanych w grunt 25 stopni, panele montowane horyzontalnie (instalacja naziemna) 2) Dostawa paneli fotowoltaicznych o mocy 345 W każdy (580 szt. x 345 WAT = 200,1 kWp) lub rozwiązanie równoważne 3) Dostawa inwerterów 4 szt. x 50 kW 4) Dostawa i montaż stacji transformatorowej 250 kVA 5) Dostawa okablowania, zabezpieczeń i akcesoriów montażowych 6) Rozbudowa instalacji nN 7) Przyłącze do stacji transformatorowej 8 mb 8) Montaż, konfiguracja i uruchomienie instalacji 9) Prace inżynierskie. Rozbudowany opis elementów instalacji zamieszczony jest w załączniku nr 10 harmonogramie rzeczowo-finansowym oraz w pkt. 2.2 Studium Wykonalności. Instalacja fotowoltaiczna będzie służyć zasilaniu w energię elektryczną obiektu przemysłowego żwirowni (ok. 189 796 kWh/rok). Etapy realizacji Projektu: - przygotowawczy - opracowano dokumentację techniczną i Studium Wykonalności, - wyboru wykonawcy inwestycji - wyłonienie zgodnie z zasadami konkurencyjności, - realizacja inwestycji - wykonanie i odbiór robót budowlanych, - końcowy - rozliczenie rzeczowe i finansowe inwestycji. Projekt wykorzystuje wsparcie na budowę infrastruktury mającej na celu produkcję energii elektrycznej z OZE – do 2 MWe/MWth (zadanie 2), co jest zgodne z celami SzOOP RPO WiM 2014-2020. (Polish)
    0 references
    Location of the investment: the gravel plant in Targów, the Commune of Dźwierzuty, the peak district. plot No 373/3 (on which the investment is planned, inter alia, through the installation of PV panels) and plot No 347/19 (a gravel plant powered by PV panels), area No. 16 Targowo. The applicant is the owner of the above properties. Scope of construction works planned to be carried out as part of the investment: 1) Delivery of support structures 25 degrees ground, horizontally mounted panels (ground installation) 2) Supply of photovoltaic panels with a power of 345 W each (580 pcs x 345 WAT = 200.1 kWp) or equivalent solution 3) Supply of inverters 4 pcs x 50 kW 4) Supply and assembly of transformer station 250 kVA 5) Supply of wiring, security and mounting accessories 6) Extension of installation nN 7) Connection to transformer station 8 mb 8) Assembly, configuration and commissioning of the installation 9) Engineering works. An extensive description of the elements of the installation is provided in Annex No 10 of the material and financial schedule and in point. 2.2 Feasibility Study. The photovoltaic installation will be used to supply electricity to the industrial gravel plant (approx. 189796 kWh/year). Stages of the Project: — preparatory – technical documentation and feasibility study, – selection of the contractor of the investment – selection in accordance with the principles of competitiveness, – implementation of the investment – execution and acceptance of construction works, – final – settlement in physical and financial terms of the investment. The project uses support for the construction of infrastructure for the production of electricity from RES – up to 2 MWe/MWth (task 2), which is in line with the objectives of the SzOOP ROP WiM 2014-2020. (English)
    8 July 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0183/18
    0 references