Construction of an electric smart grid in the city of Szczecin, Gryfiński district and the city of Świnoujście through modernisation and reconstruction of lines and stations of SN and nn, automation of lines and stations as a result of the application of remote control and electrical security automation, including short-circuit current flow indicators. (Q2692725): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed claim: EU contribution (P835): 4,704,303.25 euro) |
||
Property / EU contribution: 4,704,303.25 Euro / rank | Property / EU contribution: 4,704,303.25 Euro / rank | ||
Preferred rank |
Revision as of 12:49, 21 September 2021
Project Q2692725 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of an electric smart grid in the city of Szczecin, Gryfiński district and the city of Świnoujście through modernisation and reconstruction of lines and stations of SN and nn, automation of lines and stations as a result of the application of remote control and electrical security automation, including short-circuit current flow indicators. |
Project Q2692725 in Poland |
Statements
21,161,957.94 zloty
0 references
31,500,000.0 zloty
0 references
67.18 percent
0 references
21 December 2018
0 references
31 December 2021
0 references
ENEA OPERATOR SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Bezpośrednim celem projektu jest zapewnienie efektywnego i zrównoważonego pod względem ekonomicznym i technicznym systemu energetycznego, o niskim poziomie strat oraz wysokim poziomie jakości oraz bezpieczeństwa dostaw i ochrony. (Polish)
0 references
The direct objective of the project is to ensure an efficient and economically and technically sustainable energy system with low losses and a high level of quality and security of supply and security. (English)
7 July 2021
0 references
Identifiers
POIS.01.04.01-00-0001/19
0 references