Electrotechnical measures in mining Gand (Q3060874): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Editing descriptions in Austria)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q3062651 / rank
 
Normal rank

Revision as of 09:57, 22 July 2021

Project Q3060874 in Austria
Language Label Description Also known as
English
Electrotechnical measures in mining Gand
Project Q3060874 in Austria

    Statements

    0 references
    17,393.1 Euro
    0 references
    1 July 2019
    0 references
    31 December 2019
    0 references
    St. Antoner Fremdenverkehrs - Förderungsgesellschaft m.b.H.
    0 references
    0 references

    47°7'44.04"N, 10°15'58.93"E
    0 references
    70621
    0 references
    The lower “Markusstollen” was made accessible again by excavating the upstream loose rock and provided this section with a new, sufficiently dimensioned, approximately 16 m long wooden rooming. (English)
    20 July 2021
    0 references
    Der tiefer gelegene „Markusstollen“ wurde durch ein Wegbaggern des vorgelagerten Lockergesteins wieder zugänglich gemacht und dieser Abschnitt mit einer neuen, ausreichend dimensionierten, etwa 16 Meter langen Holzzimmerung versehen. (Austrian German)
    0 references
    St. Anton am Arlberg
    0 references

    Identifiers

    AUST-586
    0 references