New hall construction and purchase of a special pallet plant and construction of a drying chamber (Q3061072): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Innviertel / rank | |||
Normal rank |
Revision as of 11:18, 20 July 2021
Project in Austria 784
Language | Label | Description | Also known as |
---|---|---|---|
English | New hall construction and purchase of a special pallet plant and construction of a drying chamber |
Project in Austria 784 |
Statements
2,156,927.75 Euro
0 references
4 May 2015
0 references
31 August 2016
0 references
Josef Speckner GmbH
0 references
40442
0 references
In der neu errichteten Halle wird eine Anlage zur Erzeugung großer Paletten installiert, gleichzeitig mit der Kapazitätserweiterung werden eine weitere Trockenkammer mit Wärmerückgewinnung und ein asphaltierter Lagerplatz gebaut. (German)
0 references
A plant for the production of large pallets will be installed in the newly built hall. At the same time as the capacity expansion, another drying chamber with heat recovery and a paved storage site will be built. (English)
20 July 2021
0 references
Schwand im Innkreis
0 references
Identifiers
AUST-784
0 references