“Extension of the waste water treatment plant to the Racota plant and the solar sludge dryer. Construction of the sanitary sewage system in Turwi (replacement of a septic tank)” (Q135035): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The project will include works on the extension and modernisation of the wastewater treatment plant and the exchange of the network of San. and the promotion of the project. With regard to the project, it is planned to: 1) The execution of works for the extension and modernisation of the WIOŚ in the following areas: • Waste water reception and transport, including the extent of mechange.The treatment: A. Building a stopcock built with a waste wa...) |
||
Property / summary | |||
The project will include works on the extension and modernisation of the wastewater treatment plant and the exchange of the network of San. and the promotion of the project. With regard to the project, it is planned to: 1) The execution of works for the extension and modernisation of the WIOŚ in the following areas: • Waste water reception and transport, including the extent of mechange.The treatment: A. Building a stopcock built with a waste water catchment station, new; Pre-treatment box, — Waste water station Station, b. raw sewage effluent — new; c. mechanical plant — installation of a new machine in the istii of a tech Building; D. retention reservoir with the head chamber of the [ZR] — adaptation; e. recirculation building with dmuchw station with a split chamber of the [CoR], a new site. • Biological waste water treatment — 2 technological lines — new; — Defosfatation compartment, -denitrification Comora, -nitrification Comora, -Opponent of the internal recirculation, -Pump recirculation, -Repeated waste water compartment. • Seals of the sludge management system: A. Sludge stabilisation unit — new, b. sludge drying facility — new. A social building will be rebuilt, roads and communists will be built, fencing, fencing and accompanying installations: dmuchaw station, reagent dosing station, water tank technology., sewage disposal chamber., vent to receiver. 2) The execution of works of construction work for the construction of the sanitary canton in Turwi, with the following parameters: PVC collector 200 mm — 990.00 m; With PVC 160 mm — 113.00 m/13; PVC 200 mm — 81.00 m/4 units Planned tangible results of the project: • Number of urban waste water treatment plants upgraded — 1; • Length of reconstructed sanitary sewage — 1.184 km. According to the balance of quality and quantity of waste water to the wastewater treatment plant, the following waste water will flow: (a) the amount of waste water: Qdder = 820 m³/d, Qdmax = 1 110 m³/d, Qhmax = 145 m³/h. SBZT5 = 600 gO2/m³, SCHZT = 1200 gO2/m³, St.og = 600 g/m³, SN.og = 110 gn/m³, SP.og = 18 g/m³. (English) | |||
Property / summary: The project will include works on the extension and modernisation of the wastewater treatment plant and the exchange of the network of San. and the promotion of the project. With regard to the project, it is planned to: 1) The execution of works for the extension and modernisation of the WIOŚ in the following areas: • Waste water reception and transport, including the extent of mechange.The treatment: A. Building a stopcock built with a waste water catchment station, new; Pre-treatment box, — Waste water station Station, b. raw sewage effluent — new; c. mechanical plant — installation of a new machine in the istii of a tech Building; D. retention reservoir with the head chamber of the [ZR] — adaptation; e. recirculation building with dmuchw station with a split chamber of the [CoR], a new site. • Biological waste water treatment — 2 technological lines — new; — Defosfatation compartment, -denitrification Comora, -nitrification Comora, -Opponent of the internal recirculation, -Pump recirculation, -Repeated waste water compartment. • Seals of the sludge management system: A. Sludge stabilisation unit — new, b. sludge drying facility — new. A social building will be rebuilt, roads and communists will be built, fencing, fencing and accompanying installations: dmuchaw station, reagent dosing station, water tank technology., sewage disposal chamber., vent to receiver. 2) The execution of works of construction work for the construction of the sanitary canton in Turwi, with the following parameters: PVC collector 200 mm — 990.00 m; With PVC 160 mm — 113.00 m/13; PVC 200 mm — 81.00 m/4 units Planned tangible results of the project: • Number of urban waste water treatment plants upgraded — 1; • Length of reconstructed sanitary sewage — 1.184 km. According to the balance of quality and quantity of waste water to the wastewater treatment plant, the following waste water will flow: (a) the amount of waste water: Qdder = 820 m³/d, Qdmax = 1 110 m³/d, Qhmax = 145 m³/h. SBZT5 = 600 gO2/m³, SCHZT = 1200 gO2/m³, St.og = 600 g/m³, SN.og = 110 gn/m³, SP.og = 18 g/m³. (English) / rank | |||
Normal rank |
Revision as of 09:53, 11 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | “Extension of the waste water treatment plant to the Racota plant and the solar sludge dryer. Construction of the sanitary sewage system in Turwi (replacement of a septic tank)” |
Project in Poland financed by DG Regio |
Statements
7,239,893.12 zloty
0 references
15,932,598.91 zloty
0 references
3,823,823.7383999997 Euro
0.24 Euro
13 January 2020
0 references
63.75 percent
0 references
14 August 2018
0 references
30 September 2020
0 references
GMINA KOŚCIAN
0 references
Projekt obejmował będzie, prace bud. dotyczące rozbudowy i modernizacji oczyszczalni ścieków i wymiany sieci kan. san. oraz promocję projektu. W zakresie projektu planuje się: 1) Wykonanie robót bud. dot. rozbudowy i modernizacji OŚ, w zakresie: • Układu przyjęcia i transportu ścieków wraz ze stopniem mechan. oczyszczania: a. Budynek kraty wstępnej zblokowany ze stacją zlewczą ścieków – nowy; - Stan. kraty wstępnej, - Stacja zlewcza ścieków, b. Przepomp. ścieków surowych – nowy; c. Oczyszczalnia mechaniczna – urządzenie nowe w istn. budynku tech.; d. Zbiornik retencyjny z komorą zasuw [ZR] – adaptacja; e. Budynek recyrkulacyjny ze stacją dmuchaw zblokowany z komorą rozdziału [KR], – obiekt nowy. • Reaktora biologicznego oczyszczania ścieków – 2 ciągi technologiczne – nowy; -Komora defosfatacji, -Komora denitryfikacji, -Komora nitryfikacji, -Osadnik wtórny, -Przepomp. recyrkulacji wewnętrznej, -Przepomp. recyrkulacyjna, -Komora pomiarowa ścieków. • Węzła gospodarki osadowej: a. Komora stabilizacji osadu nadmiernego – nowy, b. Solarna suszarnia osadów – nowy. Przebudowany zostanie budynek socjal.-admin., wykonane zostaną drogi i ciągi komunik., ogrodzenie i obiekty towarzyszące: stacja dmuchaw, stacja dozowania reagentów, zbiornik wody technolog., komora pomiarowa ścieków oczyszcz., wylot do odbiornika. 2) Wykonanie robót bud. w zakresie budowy (wymiany) kan. sanitarnej w Turwi, o następujących parametrach: - kolektory PVC 200 mm - 990,00 m; - przyłącza PVC 160 mm - 113,00 m/ 13 szt.; - przyłącza PVC 200 mm - 81,00 m / 4 szt. Planowane efekty rzeczowe projektu: • Liczba przebudowanych oczyszczalni ścieków komunalnych – 1 szt.; • Długość przebudowanej kanalizacji sanitarnej – 1,184 km. Zgodnie z bilansem jakościowo-ilościowym ścieków do oczyszczalni ścieków dopływać będą następujące ścieki: a) ilość ścieków: Qdśr = 820 m3/d, Qdmax=1110 m3/d, Qhmax = 145 m3/h. b) jakość ścieków: SBZT5=600 gO2/m3, SCHZT = 1200 gO2/m3, Szaw.og=600 g/m3, SN.og=110 gN/m3, SP.og=18 gP/m3. (Polish)
0 references
The project will include works on the extension and modernisation of the wastewater treatment plant and the exchange of the network of San. and the promotion of the project. With regard to the project, it is planned to: 1) The execution of works for the extension and modernisation of the WIOŚ in the following areas: • Waste water reception and transport, including the extent of mechange.The treatment: A. Building a stopcock built with a waste water catchment station, new; Pre-treatment box, — Waste water station Station, b. raw sewage effluent — new; c. mechanical plant — installation of a new machine in the istii of a tech Building; D. retention reservoir with the head chamber of the [ZR] — adaptation; e. recirculation building with dmuchw station with a split chamber of the [CoR], a new site. • Biological waste water treatment — 2 technological lines — new; — Defosfatation compartment, -denitrification Comora, -nitrification Comora, -Opponent of the internal recirculation, -Pump recirculation, -Repeated waste water compartment. • Seals of the sludge management system: A. Sludge stabilisation unit — new, b. sludge drying facility — new. A social building will be rebuilt, roads and communists will be built, fencing, fencing and accompanying installations: dmuchaw station, reagent dosing station, water tank technology., sewage disposal chamber., vent to receiver. 2) The execution of works of construction work for the construction of the sanitary canton in Turwi, with the following parameters: PVC collector 200 mm — 990.00 m; With PVC 160 mm — 113.00 m/13; PVC 200 mm — 81.00 m/4 units Planned tangible results of the project: • Number of urban waste water treatment plants upgraded — 1; • Length of reconstructed sanitary sewage — 1.184 km. According to the balance of quality and quantity of waste water to the wastewater treatment plant, the following waste water will flow: (a) the amount of waste water: Qdder = 820 m³/d, Qdmax = 1 110 m³/d, Qhmax = 145 m³/h. SBZT5 = 600 gO2/m³, SCHZT = 1200 gO2/m³, St.og = 600 g/m³, SN.og = 110 gn/m³, SP.og = 18 g/m³. (English)
0 references
Identifiers
RPWP.04.03.01-30-0022/17
0 references