Increase energy efficiency of state buildings at Miera Street 3, Sigulda (Q3056971): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The aim of the project is to carry out energy efficiency improvement measures and necessary renovation measures of the state building in Miera iela 3, Siguldas Municipality, thus improving thermal stability of the building and positive impact on efficient use of energy resources in Latvia.The project in Sigulda District Administrative building of the State Police Riga District Board, Miera Street 3, Sigulda, in 2016, technical survey was carried...) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
Increase energy efficiency of state buildings at Miera Street 3, Sigulda |
Revision as of 12:40, 15 July 2021
Project Q3056971 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Increase energy efficiency of state buildings at Miera Street 3, Sigulda |
Project Q3056971 in Latvia |
Statements
254,964.7 Euro
0 references
299,958.47 Euro
0 references
9 May 2018
0 references
8 February 2019
0 references
Nodrošinājuma valsts aģentūra
0 references
Projekta mērķis ir veikt valsts ēkas Miera ielā 3, Siguldā, Siguldas novadā, energoefektivitātes paaugstināšanas un nepieciešamos ēkas atjaunošanas pasākumus, tādējādi uzlabojot ēkas siltumnoturību un pozitīvi ietekmējot energoresursu efektīvu izmantošanu Latvijā.Projekta Valsts policijas Rīgas rajona pārvaldes Siguldas iecirkņa administratīvajā ēkā, Miera ielā 3, Siguldā, 2016.gadā tika veikta tehniskā apsekošana un tika secināts, ka vispārējo ēkas tehnisko stāvokli var novērtēt kā neapmierinošu un tika konstatētas vairākas problēmas, kuru dēļ ir siltuma enerģijas zudumi un zema ēkas norobežojošo konstrukciju siltuma noturība, līdz ar to, zema energoefektivitāte, ēkai nav veikti siltumizolācijas darbi.Būtiskākās problēmas: administratīvā ēka, tika uzcelta un nodota ekspluatācijā 1975.gadā. Ēkas fiziskais nolietojums ir novērtēts vidēji vairāk nekā 35%. Vispārējais ēkas tehniskais stāvoklis ir neapmierinošs, nav energoefektīvs; jumta segums, lietus ūdens noteksistēmas un skārda pieslēgumi ir neapmierinošā tehniskā stāvoklī un neatbilst, “Būvniecības likuma” un Latvijas būvnormatīva, LBN 002-15 “Ēku norobežojošo konstrukciju siltumtehnika”, prasībām. Jumta nesošajiem ribotajiem pārseguma paneļiem, to savienojuma vietās nav hermetizētas un noblīvētas šuves. Iekštelpu siltais gaiss brīvi nokļūst jumta konstrukciju aukstajā zonā, tādējādi uzsildot to un radot kondensāta problēmas telpu iekšpusē; vecie koka durvju un vārtu bloki neatbilst Latvijas būvnormatīva, LBN 002-15 “Ēku norobežojošo konstrukciju siltumtehnika”, prasībām; nesošo ķieģeļu mūra sienu tehniskais stāvoklis ir neapmierinošs; radiatoriem nav uzstādīta termoregulēšanas sistēma; ārsienu un pamatu siltumtehniskais stāvoklis ir neapmierinošs, to radītāji neatbilst LBN 002-15 prasībām. Saskaņā ar pārskatu paredzamajā kalpošanas laikā projektā paredzēts īstenot: ārsienu siltināšana ar siltumizolācijas materiālu 150mm biezumā; pamatu siltināšana (t.sk. redzamas daļas jeb cokola) 1,15m dziļumā ar siltumizolācijas materiālu 100mm biezumā; logu nomaiņa pret janiem PVC logiem; veco koka vārtu nomaiņa pret jauniem vārtiem; durvju maiņa pret jaunām siltinātām durvīm; jumta siltināšana ar siltumizolācijas materiālu 160mm un 40mm biezumā, ieklājot jaunu hidroizolācijas slāni; apkures sistēmas atjaunošana, kas ietver sevī sildķermeņu nomaiņu; nodrošināt lietusūdeņu novadīšanu no pamatiem; apkārt ēkai ierīkot (jāatjauno) betona bruģa un asfaltbetona apmali.Pēc projekta īstenošanas tiks sagaidāmi projekta galvenie rezultāti: siltumenerģijas patēriņa samazinājums: no 211,38 MWh līdz 68,47 MWh gadā (67,61 % samazinājums) vai no 237,64 kWh/m2 gadā līdz 76,98 kWh/m2 gadā; primārās enerģijas patēriņa samazinājums: no 266,07 MWh līdz 111,51 MWh gadā (58,09 % samazinājums) vai no 299,12 kWh/m2 gadā līdz 125,36 kWh/m2 gadā. Primāras enerģijas faktors siltumenerģijai – 1,3 un elektroenerģijai 1,5; oglekļa dioksīda CO2 emisijas samazinājums gadā: no 45,95 tCO2/gadā līdz 17,28 tCO2/gadā (62,39% samazinājums). CO2 emisijas faktors siltumenerģijai 0,264 tCO2/MWh, elektroenerģijai 0,109 tCO2/MWh.Projekta ieviešanas laiks ir no 2018.gada maija līdz 2019.gada februārim kopā – 9 mēneši. Projekta attiecināmās izmaksas ir 299 958,47 EUR: 85% ir ERAF finansējums 254 964,70 EUR un 15% ir valsts budžeta līdzekļi 44 993,77 EUR. (Latvian)
0 references
The aim of the project is to carry out energy efficiency improvement measures and necessary renovation measures of the state building in Miera iela 3, Siguldas Municipality, thus improving thermal stability of the building and positive impact on efficient use of energy resources in Latvia.The project in Sigulda District Administrative building of the State Police Riga District Board, Miera Street 3, Sigulda, in 2016, technical survey was carried out and it was concluded that the overall technical condition of the building can be assessed as unsatisfactory and several problems were found, due to the building’s low energy efficiency, low thermal energy loss, low thermal energy loss. The administrative building was built and commissioned in 1975. The physical depreciation of the building is estimated to be over 35 % on average. The overall technical condition of the building is unsatisfactory, not energy efficient; Roofing, rainwater drainage systems and tin connections are in unsatisfactory technical condition and do not comply with the requirements of the Construction Law and Latvian Building Norm, LBN 002-15 “Heat Engineering of Building Structures”. Roof-bearing ribbed panels shall not be sealed and sealed at the connecting points. The indoor warm air moves freely into the cold area of roof structures, thus warming it and creating condensate problems inside the premises; Old wooden door and gate blocks do not comply with the requirements of Latvian building norm, LBN 002-15 “Heat engineering of building envelopes”; The technical condition of the supporting brick wall is unsatisfactory; The radiators are not fitted with a thermosetting system; The thermal state of exterior walls and foundations is unsatisfactory and their creators do not meet the requirements of LBN 002-15. According to the report, during the expected lifetime of the project, the project will implement: Insulation of exterior walls with a heat insulation material of 150 mm thickness; Insulation of the foundations (including visible parts or cap) at a depth of 1,15 m with insulation material of 100 mm thickness; Replacement of windows to yawn PVC windows; Replacement of old wooden gates with new gates; Change of doors to new insulated doors; Insulation of the roof with heat insulation material of 160 mm and 40 mm thickness, covering a new waterproofing layer; Renovation of the heating system, which includes replacement of heating bodies; Ensure that rainwater is discharged from the bases; To install (renovate) concrete pavement and asphalt concrete edge around the building.After project implementation the main results of the project will be expected: Reduction in thermal energy consumption: From 211,38 MWh to 68,47 MWh/year (67,61 % reduction) or from 237,64 kWh/m²/year to 76,98 kWh/m²/year; Reduction of primary energy consumption: From 266,07 MWh to 111,51 MWh/year (58,09 % reduction) or from 299,12 kWh/m²/year to 125,36 kWh/m² per year. The primary energy factor for heat: 1,3 and for electricity 1,5; Annual reduction of carbon dioxide CO2 emissions: From 45.95 tCO2/year to 17.28 tCO2/year (62.39 % reduction). CO2 emission factor for thermal energy 0,264 tCO2/MWh, electricity 0,109 tCO2/MWh.Project implementation time is from May 2018 to February 2019 total – 9 months. The eligible costs of the project are EUR 299958,47: 85 % is ERDF funding of EUR 254964.70 and 15 % is state budget of EUR 44993.77. (English)
15 July 2021
0 references
Miera iela 3, Sigulda, Siguldas nov., LV-2150
0 references
Identifiers
4.2.1.2/17/I/026
0 references