(‎Created claim: summary (P836): The aim of the project is to reduce heat loss in the energy production process, as well as reduce electricity consumption and make the system safer, to reduce operating and maintenance costs. The planned 0,99 MW chips water-heating boiler, which uses low-value wood as the main fuel, and residues in the form of chips or sawdust during wood processing with a desired moisture content of not more than 55 %. The boiler needs to build a fuel warehous...)
Property / summary
 
The aim of the project is to reduce heat loss in the energy production process, as well as reduce electricity consumption and make the system safer, to reduce operating and maintenance costs. The planned 0,99 MW chips water-heating boiler, which uses low-value wood as the main fuel, and residues in the form of chips or sawdust during wood processing with a desired moisture content of not more than 55 %. The boiler needs to build a fuel warehouse with a delivery mechanism, but the boiler itself is intended to be built in the existing boiler house with all auxiliary equipment and fully automated boiler operation. The project is intended to complement the merger of several CSSs in Stradu pag. In the villages of Station and Skistra. The project has a positive impact on the environment, as the new boiler house will use environmentally neutral fuel – wood, which is an environmentally friendly renewable energy source – and the project will reduce fuel consumption and emissions, as well as reduce the transport used for fuel input, thus also emitting fossil fuels – CO2, NOx, PM10. The use of new technologies will also reduce emissions of particulate matter, which is currently high through low-efficiency boilers and no flue gas treatment plants. It is expected that the project will be implemented until the new heating season of 2020 with CF co-financing. Its total cost could amount to around EUR 833 085 of which the CF co-funding approximately EUR 258 060. (English)
Property / summary: The aim of the project is to reduce heat loss in the energy production process, as well as reduce electricity consumption and make the system safer, to reduce operating and maintenance costs. The planned 0,99 MW chips water-heating boiler, which uses low-value wood as the main fuel, and residues in the form of chips or sawdust during wood processing with a desired moisture content of not more than 55 %. The boiler needs to build a fuel warehouse with a delivery mechanism, but the boiler itself is intended to be built in the existing boiler house with all auxiliary equipment and fully automated boiler operation. The project is intended to complement the merger of several CSSs in Stradu pag. In the villages of Station and Skistra. The project has a positive impact on the environment, as the new boiler house will use environmentally neutral fuel – wood, which is an environmentally friendly renewable energy source – and the project will reduce fuel consumption and emissions, as well as reduce the transport used for fuel input, thus also emitting fossil fuels – CO2, NOx, PM10. The use of new technologies will also reduce emissions of particulate matter, which is currently high through low-efficiency boilers and no flue gas treatment plants. It is expected that the project will be implemented until the new heating season of 2020 with CF co-financing. Its total cost could amount to around EUR 833 085 of which the CF co-funding approximately EUR 258 060. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to reduce heat loss in the energy production process, as well as reduce electricity consumption and make the system safer, to reduce operating and maintenance costs. The planned 0,99 MW chips water-heating boiler, which uses low-value wood as the main fuel, and residues in the form of chips or sawdust during wood processing with a desired moisture content of not more than 55 %. The boiler needs to build a fuel warehouse with a delivery mechanism, but the boiler itself is intended to be built in the existing boiler house with all auxiliary equipment and fully automated boiler operation. The project is intended to complement the merger of several CSSs in Stradu pag. In the villages of Station and Skistra. The project has a positive impact on the environment, as the new boiler house will use environmentally neutral fuel – wood, which is an environmentally friendly renewable energy source – and the project will reduce fuel consumption and emissions, as well as reduce the transport used for fuel input, thus also emitting fossil fuels – CO2, NOx, PM10. The use of new technologies will also reduce emissions of particulate matter, which is currently high through low-efficiency boilers and no flue gas treatment plants. It is expected that the project will be implemented until the new heating season of 2020 with CF co-financing. Its total cost could amount to around EUR 833 085 of which the CF co-funding approximately EUR 258 060. (English) / qualifier
 
point in time: 15 July 2021
Timestamp+2021-07-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:43, 15 July 2021

Project Q3057265 in Latvia
Language Label Description Also known as
English
No label defined
Project Q3057265 in Latvia

    Statements

    0 references
    0 references
    258,060.0 Euro
    0 references
    645,150.0 Euro
    0 references
    2 March 2018
    0 references
    1 March 2021
    0 references
    SIA "Gulbenes nami"
    0 references
    0 references
    0 references

    57°7'49.94"N, 26°43'53.11"E
    0 references
    Projekta mērķis ir samazināt siltumenerģijas zudumus enerģijas ražošanas procesā, ka arī pazemināt elektroenerģijas patēriņu un padarīt sistēmu drošāku, samazināt ekspluatācijas un uzturēšanas izmaksas. Plānotais 0,99 MW šķeldas ūdenssildāmais katls kurā par galveno kurināmo tiek izmantota mazvērtīga koksne un koksnes pārstrādes laikā pārpalikušie atlikumi šķeldas vai zāģu skaidas veidā ar vēlamo mitruma daudzumu ne vairāk par 55%. Katlam ir nepieciešams izbūvēt kurināmā noliktavu ar padeves mehānismu, bet pašu katlu ir paredzēts izbūvēt jau esošajā katlu mājas ēkā ar visām palīgiekārtām un pilnībā automatizētai katla darbībai. Projekts paredzēts kā papildinājums vairāku CSS apvienošanai Stradu pag. Stāķu un Šķieneru ciemos. Projekta realizēšanai ir pozitīva ietekme uz vidi, jo jaunā katlumāja izmantos videi neitrālo kurināmo – koksni, kas ir videi draudzīgais atjaunojamais energoresurss, un projekta realizācijā tiks samazināts kurināmā patēriņš un izmeši, ka arī samazināsies kurināmā pievešanai izmantotais transports, līdz ar to arī izmeši no fosilās degvielas - CO2, NOx, PM10. Izmantojot jaunākās tehnoloģijas, tiks samazināts arī cieto daļiņu izmešu apjoms, kurš pašlaik ir augsts, kurinot ar zemas efektivitātes katliem, un bez dūmgāzu attīrīšanas iekārtām. Paredzams, ka projekts tiks īstenots līdz jaunās 2020. gada apkures sezonas ar KF līdzfinansējuma piesaisti. Tā kopējās izmaksas varētu sasniegt ap EUR 833 085 no kā aptuveni EUR 258 060 sastādīt KF līdzfinansējums. (Latvian)
    0 references
    The aim of the project is to reduce heat loss in the energy production process, as well as reduce electricity consumption and make the system safer, to reduce operating and maintenance costs. The planned 0,99 MW chips water-heating boiler, which uses low-value wood as the main fuel, and residues in the form of chips or sawdust during wood processing with a desired moisture content of not more than 55 %. The boiler needs to build a fuel warehouse with a delivery mechanism, but the boiler itself is intended to be built in the existing boiler house with all auxiliary equipment and fully automated boiler operation. The project is intended to complement the merger of several CSSs in Stradu pag. In the villages of Station and Skistra. The project has a positive impact on the environment, as the new boiler house will use environmentally neutral fuel – wood, which is an environmentally friendly renewable energy source – and the project will reduce fuel consumption and emissions, as well as reduce the transport used for fuel input, thus also emitting fossil fuels – CO2, NOx, PM10. The use of new technologies will also reduce emissions of particulate matter, which is currently high through low-efficiency boilers and no flue gas treatment plants. It is expected that the project will be implemented until the new heating season of 2020 with CF co-financing. Its total cost could amount to around EUR 833 085 of which the CF co-funding approximately EUR 258 060. (English)
    15 July 2021
    0 references
    Jaunakas, Šķieneri, Stradu pag., Gulbenes nov., LV-4417