(Created claim: summary (P836): The aim of the project is to rebuild the duvet (increasing the bearing capacity of the duvet), which includes construction of new asphalt concrete pavement, construction supervision, author supervision, as a result of which comfortable and safe driving conditions will be provided to road users. The total planned duration of the project is 26 months. The estimated total cost of the project is EUR 19214335,90. As a result of the implementation of...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to rebuild the duvet (increasing the bearing capacity of the duvet), which includes construction of new asphalt concrete pavement, construction supervision, author supervision, as a result of which comfortable and safe driving conditions will be provided to road users. The total planned duration of the project is 26 months. The estimated total cost of the project is EUR 19214335,90. As a result of the implementation of the project, the main state motorway A2 Riga – Sigulda – the Estonian Rob will be arranged. (Veclaicene) (both carriageway) section 20.20 km. The maximum driving axle load on the road section covered by the project will be 11.5 tonnes and the maximum uncontrolled vehicle mass will be 44 tonnes. (English) | |||||||||||||||
Property / summary: The aim of the project is to rebuild the duvet (increasing the bearing capacity of the duvet), which includes construction of new asphalt concrete pavement, construction supervision, author supervision, as a result of which comfortable and safe driving conditions will be provided to road users. The total planned duration of the project is 26 months. The estimated total cost of the project is EUR 19214335,90. As a result of the implementation of the project, the main state motorway A2 Riga – Sigulda – the Estonian Rob will be arranged. (Veclaicene) (both carriageway) section 20.20 km. The maximum driving axle load on the road section covered by the project will be 11.5 tonnes and the maximum uncontrolled vehicle mass will be 44 tonnes. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to rebuild the duvet (increasing the bearing capacity of the duvet), which includes construction of new asphalt concrete pavement, construction supervision, author supervision, as a result of which comfortable and safe driving conditions will be provided to road users. The total planned duration of the project is 26 months. The estimated total cost of the project is EUR 19214335,90. As a result of the implementation of the project, the main state motorway A2 Riga – Sigulda – the Estonian Rob will be arranged. (Veclaicene) (both carriageway) section 20.20 km. The maximum driving axle load on the road section covered by the project will be 11.5 tonnes and the maximum uncontrolled vehicle mass will be 44 tonnes. (English) / qualifier | |||||||||||||||
point in time: 15 July 2021
|
Revision as of 12:47, 15 July 2021
Project Q3057592 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3057592 in Latvia |
Statements
13,974,816.0 Euro
0 references
16,440,959.99 Euro
0 references
18 September 2015
0 references
17 November 2017
0 references
Satiksmes ministrija
0 references
Projekta mērķis ir veikt segas pārbūvi (paaugstinot segas nestspēju), kas ietver jauna asfaltbetona seguma izbūvi, būvuzraudzību, autoruzraudzību, kā rezultātā tiks nodrošināti autoceļu lietotājiem komfortabli un droši braukšanas apstākļi. Plānotais kopējais projekta īstenošanas ilgums 26 mēneši. Projekta plānotās kopējās izmaksas 19 214 335,90 euro. Projekta īstenošanas rezultātā tiks sakārtots valsts galvenā autoceļa A2 Rīga - Sigulda - Igaunijas rob. (Veclaicene) (abas brauktuves) posms 20,20 km garumā. Projektā ietvertā autoceļa posma maksimālā autotransporta dzenošās ass slodze pēc projekta īstenošanas būs 11,5 tonnas un maksimālā nekontrolētā transportlīdzekļa pilnā masa būs 44 tonnas. (Latvian)
0 references
The aim of the project is to rebuild the duvet (increasing the bearing capacity of the duvet), which includes construction of new asphalt concrete pavement, construction supervision, author supervision, as a result of which comfortable and safe driving conditions will be provided to road users. The total planned duration of the project is 26 months. The estimated total cost of the project is EUR 19214335,90. As a result of the implementation of the project, the main state motorway A2 Riga – Sigulda – the Estonian Rob will be arranged. (Veclaicene) (both carriageway) section 20.20 km. The maximum driving axle load on the road section covered by the project will be 11.5 tonnes and the maximum uncontrolled vehicle mass will be 44 tonnes. (English)
15 July 2021
0 references
Garkalnes pag., Ropažu nov.
0 references
Garkalnes pag., Ropažu nov.
0 references
Garkalnes pag., Ropažu nov.
0 references
Identifiers
6.1.5.0/15/I/005
0 references