Energy Efficiency at Hospital de São Bernardo in Setúbal (Q2981194): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 14:49, 15 September 2021

Project Q2981194 in Portugal
Language Label Description Also known as
English
Energy Efficiency at Hospital de São Bernardo in Setúbal
Project Q2981194 in Portugal

    Statements

    0 references
    5,000,000.0 Euro
    0 references
    1 January 2017
    0 references
    31 August 2022
    0 references
    CENTRO HOSPITALAR DE SETÚBAL, EPE
    0 references
    0 references
    0 references

    38°31'41.99"N, 8°51'56.99"W
    0 references
    O Hospital de Setúbal propõe-se reconverter os seus sistemas energéticos, de forma a obter poupanças significativas, incidindo sobre os drivers de consumo energético, utilização de LED em toda a iluminação, painéis solares térmicos, sistema de gestão técnica, adição de variadores nas bombas, isolamento em tubagens, novos fancoils e UTA’s, isolamento de fachada e produção de eletricidade por painéis fotovoltaicos. (Portuguese)
    0 references
    The Hospital de Setúbal proposes to reconvert its energy systems in order to obtain significant savings, focusing on energy consumption drivers, use of LED in all lighting, thermal solar panels, technical management system, addition of multipliers in pumps, insulation in pipes, new fancoils and UTAs, insulation of the front and production of electricity by photovoltaic panels. (English)
    9 July 2021
    0 references
    Setúbal, Setúbal (São Sebastião)
    0 references

    Identifiers

    POSEUR-01-1203-FC-000080
    0 references