Drainage subsystem of Lamarosa (Lamarosa and Árgea) (Q2982541): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 15:03, 15 September 2021

Project Q2982541 in Portugal
Language Label Description Also known as
English
Drainage subsystem of Lamarosa (Lamarosa and Árgea)
Project Q2982541 in Portugal

    Statements

    0 references
    1,431,570.01 Euro
    0 references
    1 November 2017
    0 references
    31 December 2019
    0 references
    AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
    0 references
    0 references
    0 references

    39°31'46.74"N, 8°29'14.39"W
    0 references
    A operação visa dotar as povoações de Árgea e de Lamarosa de um sistema de recolha, transporte e tratamento de águas residuais domésticas para 966 e.p., onde atualmente já existem redes em baixa mas sem tratamento associado e com descargas diretas para as linhas de água. Para o efeito serão construídas uma ETAR e as infraestruturas necessárias à integração das redes existentes (intercetores, sistemas elevatórios). (Portuguese)
    0 references
    The operation aims to provide the villages of Árgea and Lamarosa with a system for collecting, transporting and treating domestic waste water for 966 p.c., where currently there are already low but untreated networks associated with direct discharges to the water lines. To this end, a sewage treatment plant and the infrastructure necessary for the integration of existing networks (interceptors, lift systems) will be built. (English)
    9 July 2021
    0 references
    Torres Novas, União das freguesias de Olaia e Paço
    0 references

    Identifiers

    POSEUR-03-2012-FC-000773
    0 references