Public Drainage of Waste Waters of Nabais and Nabainhos (Q2982627): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 14:42, 15 September 2021

Project Q2982627 in Portugal
Language Label Description Also known as
English
Public Drainage of Waste Waters of Nabais and Nabainhos
Project Q2982627 in Portugal

    Statements

    0 references
    146,638.7 Euro
    0 references
    1 August 2018
    0 references
    31 October 2020
    0 references
    MUNICÍPIO DE GOUVEIA
    0 references
    Q2991041 (Deleted Item)
    0 references
    0 references

    40°31'26.65"N, 7°32'33.18"W
    0 references
    O presente projeto refere-se ao fecho da rede de SAR nas povoações de Nabais e Nabainhos. As soluções técnicas preconizadas envolvem a: (i) Construção de 3 estações elevatórias e (ii) Construção de rede coletores. Em termos populacionais na área de influência do projeto, o projeto contribui para o acréscimo de 340 pessoas ligados ao sistema de SAR. (Portuguese)
    0 references
    The present project refers to the closure of the SAR network in the villages of Nabais and Nabainhos. The recommended technical solutions involve: (i) Construction of 3 lift stations and (ii) Construction of network collectors. In terms of population in the area of influence of the project, the project contributes to the addition of 340 people connected to the SAR system. (English)
    9 July 2021
    0 references
    Gouveia, União das freguesias de Melo e Nabais
    0 references

    Identifiers

    POSEUR-03-2012-FC-000999
    0 references