Closure of Wastewater Sanitation Systems Connection to the sewage treatment plant of Pedrogão Grande (Tojeira, Valongo and Lord of the Afflicted) (Q2982804): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Q3054883 (Deleted Item) | |||
Property / beneficiary: Q3054883 (Deleted Item) / rank | |||
Normal rank |
Revision as of 08:37, 9 July 2021
Project Q2982804 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Closure of Wastewater Sanitation Systems Connection to the sewage treatment plant of Pedrogão Grande (Tojeira, Valongo and Lord of the Afflicted) |
Project Q2982804 in Portugal |
Statements
324,514.21 Euro
0 references
85.0 percent
0 references
6 January 2020
0 references
31 August 2021
0 references
APIN - EMPRESA INTERMUNICIPAL DE AMBIENTE DO PINHAL INTERIOR, E.I.M., S.A.
0 references
Q3054883 (Deleted Item)
0 references
Através de e-mail de 03-12-2019 o Beneficiário alterou a solução inicial e a operação passou a incluir a execução de 3,9 km de coletores gravíticos, 1 estação elevatória, 0,75 km de condutas elevatórias e 107 ramais domiciliários com ligação ao Subsistema de Saneamento de Pedrógão Grande e tratamento final na ETAR de Pedrógão Grande. (Portuguese)
0 references
Through e-mail of 03-12-2019 the Beneficiary changed the initial solution and the operation began to include the execution of 3.9 km of gravitic collectors, 1 lift station, 0.75 km of lifting ducts and 107 branches of home with connection to the Great Pedrógão Sanitation Subsystem and final treatment in the treatment plant of Pedrógão Grande. (English)
9 July 2021
0 references
Pedrógão Grande, Pedrógão Grande
0 references
Identifiers
POSEUR-03-2012-FC-001225
0 references