Works at Carrascal Water Treatment Station (Q2982580): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The operation aims at the rehabilitation of a sewage treatment plant, in order to maximise compliance with the regulations, ensuring greater intervention in the field of environmental protection, especially at the level of water bodies, and contributing to the optimisation of existing resources and infrastructure, ensuring the quality of the service provided to the population and the sustainability of urban water treatment systems., translated_s...)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Q2991038 (Deleted Item)
Property / beneficiary: Q2991038 (Deleted Item) / rank
 
Normal rank

Revision as of 08:36, 9 July 2021

Project Q2982580 in Portugal
Language Label Description Also known as
English
Works at Carrascal Water Treatment Station
Project Q2982580 in Portugal

    Statements

    0 references
    73,300.86 Euro
    0 references
    85.0 percent
    0 references
    1 March 2018
    0 references
    29 December 2019
    0 references
    MUNICÍPIO DE VILA DE REI
    0 references
    Q2991038 (Deleted Item)
    0 references
    0 references

    39°40'33.53"N, 8°8'39.19"W
    0 references
    A operação visa a reabilitação de uma ETAR, no sentido de maximizar o cumprimento dos normativos, assegurando maior intervenção no âmbito da proteção do ambiente, especialmente ao nível das massas de água e, contribuir para a otimização dos recursos e infraestruturas existentes, garantindo a qualidade do serviço prestado às populações e a sustentabilidade dos sistemas de tratamento de águas urbanas. (Portuguese)
    0 references
    The operation aims at the rehabilitation of a sewage treatment plant, in order to maximise compliance with the regulations, ensuring greater intervention in the field of environmental protection, especially at the level of water bodies, and contributing to the optimisation of existing resources and infrastructure, ensuring the quality of the service provided to the population and the sustainability of urban water treatment systems. (English)
    9 July 2021
    0 references
    Vila de Rei, Vila de Rei
    0 references

    Identifiers

    POSEUR-03-2012-FC-000830
    0 references