Reconstruction of the district road 1442N from the junction with DK51 in the village of Sshecowo to the village of Tuławki, then en route to the district road of 1449N by Gada to the district road 1430N, then by the district road 1430N through the town of Barccwko to DK16 (Q132700): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The construction of the road is expected to be upgraded. 1442N from the intersection with DK51 in m. 1449N by Gada to the road. 1430N, hereinafter: 1430N by M. Barchev to DK16. Detailed scope of the investment: — Construction of a section of road No 1442N from the intersection with DK 51 in m. 10.428 km (0 + 072 to 10 + 500 km) -Reconstruction of road section No 1442N from km 10 + 500 by m. 6.486 km — Construction of a section of district road N...) |
||
Property / summary | |||
The construction of the road is expected to be upgraded. 1442N from the intersection with DK51 in m. 1449N by Gada to the road. 1430N, hereinafter: 1430N by M. Barchev to DK16. Detailed scope of the investment: — Construction of a section of road No 1442N from the intersection with DK 51 in m. 10.428 km (0 + 072 to 10 + 500 km) -Reconstruction of road section No 1442N from km 10 + 500 by m. 6.486 km — Construction of a section of district road No 1430N from the junction with district road No 1449 to M. Barczewo DK 16 with a length of time 9.52 km (6 + 080 km to 15.600 km). Furthermore, as ineligible expenditure the renovation of the section from 15 + 600 km to 16 + 517 km is foreseen. 0.917 km. Deadweight: a. current: 80 kN/axle, b. after design: 100 kN/axle. A detailed technical description is included in the attached project documentation. The technical parameters of the upgraded section of road are determined on the basis of the user (demand) forecast. The phases of the implementation of the project: — the request for the DOF. Signature of the contract for the DOF. — The selection of the contractor in accordance with the PHP, the conclusion of the contract with the contractor and the start of works to be carried out in accordance with the planned timetable — project promotion — completion of the project and signature of the final protocol — final settlement of the project — The project is in line with the assumption set out in the ROP WWM 2014-2020 for the purpose: Availability and internal improvement of the transport coherence of MOF Olsztyn. The project relates to the renovation of the local road in the urban functional area Olsztyn (Mobilita MOF). The project is a 1442N project from the intersection with DK51 in Sshcowo to the village of Tuławki, then en route to the district road of 1449N by Gada to the district road 1430N, then by the district road 1430N through the town of Barccwko to DK16. (English) | |||
Property / summary: The construction of the road is expected to be upgraded. 1442N from the intersection with DK51 in m. 1449N by Gada to the road. 1430N, hereinafter: 1430N by M. Barchev to DK16. Detailed scope of the investment: — Construction of a section of road No 1442N from the intersection with DK 51 in m. 10.428 km (0 + 072 to 10 + 500 km) -Reconstruction of road section No 1442N from km 10 + 500 by m. 6.486 km — Construction of a section of district road No 1430N from the junction with district road No 1449 to M. Barczewo DK 16 with a length of time 9.52 km (6 + 080 km to 15.600 km). Furthermore, as ineligible expenditure the renovation of the section from 15 + 600 km to 16 + 517 km is foreseen. 0.917 km. Deadweight: a. current: 80 kN/axle, b. after design: 100 kN/axle. A detailed technical description is included in the attached project documentation. The technical parameters of the upgraded section of road are determined on the basis of the user (demand) forecast. The phases of the implementation of the project: — the request for the DOF. Signature of the contract for the DOF. — The selection of the contractor in accordance with the PHP, the conclusion of the contract with the contractor and the start of works to be carried out in accordance with the planned timetable — project promotion — completion of the project and signature of the final protocol — final settlement of the project — The project is in line with the assumption set out in the ROP WWM 2014-2020 for the purpose: Availability and internal improvement of the transport coherence of MOF Olsztyn. The project relates to the renovation of the local road in the urban functional area Olsztyn (Mobilita MOF). The project is a 1442N project from the intersection with DK51 in Sshcowo to the village of Tuławki, then en route to the district road of 1449N by Gada to the district road 1430N, then by the district road 1430N through the town of Barccwko to DK16. (English) / rank | |||
Normal rank |
Revision as of 13:06, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the district road 1442N from the junction with DK51 in the village of Sshecowo to the village of Tuławki, then en route to the district road of 1449N by Gada to the district road 1430N, then by the district road 1430N through the town of Barccwko to DK16 |
Project in Poland financed by DG Regio |
Statements
16,137,096.07 zloty
0 references
35,068,181.28 zloty
0 references
53.0 percent
0 references
25 July 2018
0 references
31 December 2021
0 references
POWIAT OLSZTYŃSKI
0 references
Przewiduje się przebudowę drogi pow. 1442N od skrzyżowania z DK51 w m. Spręcowo do m. Tuławki, dalej drogą pow. 1449N przez Gady do drogi pow. 1430N, dalej drogą pow. 1430N przez m. Barczewko do DK16. Szczegółowy zakres inwestycji: -Przebudowa odcinka drogi pow. nr 1442N od skrzyżowania z DK 51 w m. Spręcowo w kierunku m. Tuławki do km 10+500 o dł. 10,428 km (od 0+072 do 10+500 km) -Przebudowa odcinka drogi pow. nr 1442N od km 10+500 przez m. Tuławki do skrzyżowania z drogą powiatową nr 1449N, dalej do skrzyżowania z drogą powiatową nr 1430N Różnowo-Barczewko wraz z jego przebudową o dł.: 6,486 km - Przebudowa odcinka drogi powiatowej nr 1430N od skrzyżowania z droga powiatową nr 1449 do M. Barczewo DK 16 o dł. 9,52 km (od 6+080 km do 15,600 km). Ponadto przewidziano, jako wydatek niekwalifikowalny, remont odcinka od 15+600 km do 16+517 km o dł. 0,917 km. Nośność: a. aktualne: 80 kN/oś, b. po projekcie: 100 kN/oś. Szczegółowy opis techniczny zawarto w dołączonej dokumentacji projektowej. Parametry techniczne przebudowanego odcinka drogi określono na podstawie prognozy użytkowników (popytu). Etapy realizacji projektu: -złożenie wniosku o dof. -podpisanie umowy o dof. -wybór wykonawcy zgodnie z PZP -zawarcie umowy z wykonawcą i rozpoczęcie prac -realizacja prac zgodnie z założonym harmonogramem -promocja projektu -zakończenie projektu i podpisanie protokołu końcowego -końcowe rozliczenie projektu Projekt wpisuje się w założenia określone w SzOOP RPO WWM 2014-2020 realizując założony cel: Poprawa zewn. dostępności i wewn. spójności transportowej MOF Olsztyna. Przedmiotem projektu jest przebudowa drogi lokalnej w miejskim obszarze funkcjonalnym Olsztyna (Mobilny MOF). Projekt jest przedsięwzięciem na drodze 1442N od skrzyżowania z DK51 w miejscowości Spręcowo do miejscowości Tuławki, dalej drogą powiatową 1449N przez Gady do drogi powiatowej 1430N, dalej drogą powiatową 1430N przez miejscowość Barczewko do DK16. (Polish)
0 references
The construction of the road is expected to be upgraded. 1442N from the intersection with DK51 in m. 1449N by Gada to the road. 1430N, hereinafter: 1430N by M. Barchev to DK16. Detailed scope of the investment: — Construction of a section of road No 1442N from the intersection with DK 51 in m. 10.428 km (0 + 072 to 10 + 500 km) -Reconstruction of road section No 1442N from km 10 + 500 by m. 6.486 km — Construction of a section of district road No 1430N from the junction with district road No 1449 to M. Barczewo DK 16 with a length of time 9.52 km (6 + 080 km to 15.600 km). Furthermore, as ineligible expenditure the renovation of the section from 15 + 600 km to 16 + 517 km is foreseen. 0.917 km. Deadweight: a. current: 80 kN/axle, b. after design: 100 kN/axle. A detailed technical description is included in the attached project documentation. The technical parameters of the upgraded section of road are determined on the basis of the user (demand) forecast. The phases of the implementation of the project: — the request for the DOF. Signature of the contract for the DOF. — The selection of the contractor in accordance with the PHP, the conclusion of the contract with the contractor and the start of works to be carried out in accordance with the planned timetable — project promotion — completion of the project and signature of the final protocol — final settlement of the project — The project is in line with the assumption set out in the ROP WWM 2014-2020 for the purpose: Availability and internal improvement of the transport coherence of MOF Olsztyn. The project relates to the renovation of the local road in the urban functional area Olsztyn (Mobilita MOF). The project is a 1442N project from the intersection with DK51 in Sshcowo to the village of Tuławki, then en route to the district road of 1449N by Gada to the district road 1430N, then by the district road 1430N through the town of Barccwko to DK16. (English)
0 references
Identifiers
RPWM.07.02.01-28-0002/18
0 references