Extension of the Water Supply Network in the Municipality of Penela (Q2982493): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high., remove_old_english_tran...) |
(Created claim: summary (P836): The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high. (English) | |||||||||||||||
Property / summary: The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high. (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 02:06, 9 July 2021
Project Q2982493 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension of the Water Supply Network in the Municipality of Penela |
Project Q2982493 in Portugal |
Statements
700,832.56 Euro
0 references
85.0 percent
0 references
1 April 2017
0 references
31 March 2020
0 references
MUNICÍPIO DE PENELA
0 references
A operação consiste na execução de condutas adutoras uma extensão total de 8.296m, dois reservatórios e uma estação elevatória, com ligação ao sistema em Alta, no sentido de garantir a eficiência deste sistema.A operação contempla a construção destas adutoras que irão garantir o abastecimento de água às localidades de Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela e Fonte Redoiça com ligação ao sistema em alta. (Portuguese)
0 references
The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high. (English)
9 July 2021
0 references
Penela
0 references
Identifiers
POSEUR-03-2012-FC-000704
0 references