Construction of water treatment plant for agglomerate (Q2982577): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claim: summary (P836): The operation aims to build a sewage treatment plant, replacing the septic tank currently existing in the cluster of Olas., remove_old_english_translation)
Property / summary
The operation aims to build a sewage treatment plant, replacing the septic tank currently existing in the cluster of Olas. (English)
 
Property / summary: The operation aims to build a sewage treatment plant, replacing the septic tank currently existing in the cluster of Olas. (English) / rank
Normal rank
 
Property / summary: The operation aims to build a sewage treatment plant, replacing the septic tank currently existing in the cluster of Olas. (English) / qualifier
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 02:08, 9 July 2021

Project Q2982577 in Portugal
Language Label Description Also known as
English
Construction of water treatment plant for agglomerate
Project Q2982577 in Portugal

    Statements

    0 references
    212,241.61 Euro
    0 references
    85.0 percent
    0 references
    1 March 2018
    0 references
    29 February 2020
    0 references
    MUNICÍPIO DE SÃO JOÃO DA PESQUEIRA
    0 references
    0 references
    A operação visa construção de uma ETAR, substituindo a fossa séptica atualmente existente no aglomerado de Ôlas. (Portuguese)
    0 references
    São João da Pesqueira, Vale de Figueira
    0 references

    Identifiers

    POSEUR-03-2012-FC-000825
    0 references