Extension of the Wastewater Sanitation Network – Freguesia de Cadima e Sanguinheira, Cantanhede (Q2982144): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claim: summary (P836): The solution for designing the operation comprises the construction of collection and emissary networks over a length of 9.5 km, 132 sewage branches, 2 sewage lifting stations and their lifting ducts with an approximate length of 0.4 km, and it is expected to serve 232 inhabitants (resident population), with a total investment cost of 798,717,11EURuros., remove_old_english_translation)
Property / summary
The solution for designing the operation comprises the construction of collection and emissary networks over a length of 9.5 km, 132 sewage branches, 2 sewage lifting stations and their lifting ducts with an approximate length of 0.4 km, and it is expected to serve 232 inhabitants (resident population), with a total investment cost of 798,717,11EURuros. (English)
 
Property / summary: The solution for designing the operation comprises the construction of collection and emissary networks over a length of 9.5 km, 132 sewage branches, 2 sewage lifting stations and their lifting ducts with an approximate length of 0.4 km, and it is expected to serve 232 inhabitants (resident population), with a total investment cost of 798,717,11EURuros. (English) / rank
Normal rank
 
Property / summary: The solution for designing the operation comprises the construction of collection and emissary networks over a length of 9.5 km, 132 sewage branches, 2 sewage lifting stations and their lifting ducts with an approximate length of 0.4 km, and it is expected to serve 232 inhabitants (resident population), with a total investment cost of 798,717,11EURuros. (English) / qualifier
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 01:54, 9 July 2021

Project Q2982144 in Portugal
Language Label Description Also known as
English
Extension of the Wastewater Sanitation Network – Freguesia de Cadima e Sanguinheira, Cantanhede
Project Q2982144 in Portugal

    Statements

    0 references
    675,598.1 Euro
    0 references
    85.0 percent
    0 references
    1 June 2016
    0 references
    31 December 2020
    0 references
    INOVA - EMPRESA DE DESENVOLVIMENTO ECONÓMICO E SOCIAL DE CANTANHEDE, EM - S.A.
    0 references
    0 references

    40°21'55.76"N, 8°39'29.95"W
    0 references
    A solução de conceção da operação, ompreende a construção de redes coletoras e emissários numa extensão de 9,5 km, 132 ramais domiciliários de esgoto, 2 estações elevatórias de águas residuais e respetivas condutas elevatórias com uma extensão aproximada de 0,4 km, prevendo-se que sirva 232 habitantes (população residente), com um custo total de investimento de 798.717,11€uros. (Portuguese)
    0 references
    Cantanhede
    0 references

    Identifiers

    POSEUR-03-2012-FC-000205
    0 references