ELABORATION OF THE REGISTER OF INFRASTRUCTURES IN THE LOWER SYSTEMS OF THE MUNICIPALITY OF PENELA (Q2982040): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The PM intends to carry out the cadastral survey of its entire water supply network (220 km) and the Wastewater Sanitation Network (30 km) aiming at a more efficient management of services, either by identifying the needs of future interventions, or by the introduction of control and information mechanisms that avoid losses and reduce operating costs., remove_old_english_translation)
(‎Created claim: summary (P836): The PM intends to carry out the cadastral survey of its entire water supply network (220 km) and the Wastewater Sanitation Network (30 km) aiming at a more efficient management of services, either by identifying the needs of future interventions, or by the introduction of control and information mechanisms that avoid losses and reduce operating costs., translated_summary)
Property / summary
 
The PM intends to carry out the cadastral survey of its entire water supply network (220 km) and the Wastewater Sanitation Network (30 km) aiming at a more efficient management of services, either by identifying the needs of future interventions, or by the introduction of control and information mechanisms that avoid losses and reduce operating costs. (English)
Property / summary: The PM intends to carry out the cadastral survey of its entire water supply network (220 km) and the Wastewater Sanitation Network (30 km) aiming at a more efficient management of services, either by identifying the needs of future interventions, or by the introduction of control and information mechanisms that avoid losses and reduce operating costs. (English) / rank
 
Normal rank
Property / summary: The PM intends to carry out the cadastral survey of its entire water supply network (220 km) and the Wastewater Sanitation Network (30 km) aiming at a more efficient management of services, either by identifying the needs of future interventions, or by the introduction of control and information mechanisms that avoid losses and reduce operating costs. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 01:52, 9 July 2021

Project Q2982040 in Portugal
Language Label Description Also known as
English
ELABORATION OF THE REGISTER OF INFRASTRUCTURES IN THE LOWER SYSTEMS OF THE MUNICIPALITY OF PENELA
Project Q2982040 in Portugal

    Statements

    0 references
    66,155.08 Euro
    0 references
    85.0 percent
    0 references
    31 January 2017
    0 references
    31 December 2017
    0 references
    MUNICÍPIO DE PENELA
    0 references
    0 references

    40°1'45.98"N, 8°23'24.86"W
    0 references
    O MP pretende realizar o levantamento cadastral de toda a sua rede de Abastecimento de Água (220km) e da Rede de Saneamento de Águas Residuais (30km) visando uma gestão mais eficiente dos serviços, quer pela identificação das necessidades de intervenções futuras, quer pela introdução de mecanismos de controlo e informação que evitem perdas e diminuam custos de operação. (Portuguese)
    0 references
    The PM intends to carry out the cadastral survey of its entire water supply network (220 km) and the Wastewater Sanitation Network (30 km) aiming at a more efficient management of services, either by identifying the needs of future interventions, or by the introduction of control and information mechanisms that avoid losses and reduce operating costs. (English)
    9 July 2021
    0 references
    Penela
    0 references

    Identifiers

    POSEUR-03-2012-FC-000066
    0 references