Installation of the secondary network of fuel management bands and adaptation of the forest road network (Q2981512): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Action 1is divided into 4 plotsP1Management fuel, shedding/p trainingP2Manager fuelP3Combustible management (mec60 %x man40 %), shedding/p trainingP4-fuel management (mec60 %x man40 %)Action 2 is divided into 4 sitesL1Benef. RVF, valet ben/aber and lateral deviationsL2Benef. RVF, valet ben/aber and lateral deviations L3-Benef. RVF, valet ben and lateral deviations L4-Benef. RVF, valet ben and side deviations., translated_summary)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Q2991041 (Deleted Item)
Property / beneficiary: Q2991041 (Deleted Item) / rank
 
Normal rank

Revision as of 08:31, 9 July 2021

Project Q2981512 in Portugal
Language Label Description Also known as
English
Installation of the secondary network of fuel management bands and adaptation of the forest road network
Project Q2981512 in Portugal

    Statements

    0 references
    146,305.93 Euro
    0 references
    85.0 percent
    0 references
    31 October 2016
    0 references
    28 December 2017
    0 references
    MUNICÍPIO DE GOUVEIA
    0 references
    Q2991041 (Deleted Item)
    0 references
    0 references

    40°29'51.86"N, 7°35'45.06"W
    0 references
    Ação 1é dividida em 4 parcelasP1–Gestão man combustível, desramação/p formaçãoP2–Gestão man combustívelP3–Gestão combustível (mec60%x man40%), desramação/p formaçãoP4-Gestão combustível (mec60%x man40%)Ação 2 é dividida em 4 locaisL1–Benef. RVF, ben/aber de valeta e desvios lateraisL2–Benef. RVF, ben/aber de valeta e desvios lateraisL3-Benef. RVF, ben de valeta e desvios laterais L4-Benef. RVF, ben de valeta e desvios laterais. (Portuguese)
    0 references
    Action 1is divided into 4 plotsP1Management fuel, shedding/p trainingP2Manager fuelP3Combustible management (mec60 %x man40 %), shedding/p trainingP4-fuel management (mec60 %x man40 %)Action 2 is divided into 4 sitesL1Benef. RVF, valet ben/aber and lateral deviationsL2Benef. RVF, valet ben/aber and lateral deviations L3-Benef. RVF, valet ben and lateral deviations L4-Benef. RVF, valet ben and side deviations. (English)
    9 July 2021
    0 references
    Gouveia
    0 references

    Identifiers

    POSEUR-02-1810-FC-000085
    0 references