Maintenance of the Dunar Ecosystem of Mira Beach (Q2981463): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways., translated_summary)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Maintenance of the Dunar Ecosystem of Mira Beach

Revision as of 01:39, 9 July 2021

Project Q2981463 in Portugal
Language Label Description Also known as
English
Maintenance of the Dunar Ecosystem of Mira Beach
Project Q2981463 in Portugal

    Statements

    0 references
    124,345.37 Euro
    0 references
    85.0 percent
    0 references
    9 October 2019
    0 references
    9 October 2020
    0 references
    MUNICÍPIO DE MIRA
    0 references
    0 references

    40°27'8.86"N, 8°47'58.81"W
    0 references
    O projeto objetiva-se na recuperação do sistema dunar entre a duna a sul da marginal e o último apoio da praia (com uma extensão de 680 metros), com soluções de estabilização e proteção do cordão dunar, através do recurso à implementação de passadiços. (Portuguese)
    0 references
    The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways. (English)
    9 July 2021
    0 references
    Mira, Praia de Mira
    0 references

    Identifiers

    POSEUR-02-1809-FC-000069
    0 references