Energy Efficiency at Hospital de Abrantes (Q2981185): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The Hospital de Abrantes proposes to reconvert its energy systems in order to obtain significant savings, maintaining and improving service outputs and security in supply. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in hot water production system and new glazing, remove_old_english_translation) |
(Created claim: summary (P836): The Hospital de Abrantes proposes to reconvert its energy systems in order to obtain significant savings, maintaining and improving service outputs and security in supply. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in hot water production system and new glazing, translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The Hospital de Abrantes proposes to reconvert its energy systems in order to obtain significant savings, maintaining and improving service outputs and security in supply. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in hot water production system and new glazing (English) | |||||||||||||||
Property / summary: The Hospital de Abrantes proposes to reconvert its energy systems in order to obtain significant savings, maintaining and improving service outputs and security in supply. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in hot water production system and new glazing (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The Hospital de Abrantes proposes to reconvert its energy systems in order to obtain significant savings, maintaining and improving service outputs and security in supply. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in hot water production system and new glazing (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 01:32, 9 July 2021
Project Q2981185 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy Efficiency at Hospital de Abrantes |
Project Q2981185 in Portugal |
Statements
985,064.61 Euro
0 references
85.0 percent
0 references
1 January 2017
0 references
30 April 2021
0 references
CENTRO HOSPITALAR DO MÉDIO TEJO EPE
0 references
O Hospital de Abrantes propõe-se reconverter os seus sistemas energéticos, de forma a obter poupanças significativas, mantendo e melhorando os outputs de serviço e de segurança no abastecimento. Esta operação incidir sobre os drivers de consumo energético, nomeadamente: Introdução de LED, produção de energia através de painéis fotovoltaico, melhoria no sistema de produção de água quente e novos envidraçados (Portuguese)
0 references
The Hospital de Abrantes proposes to reconvert its energy systems in order to obtain significant savings, maintaining and improving service outputs and security in supply. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in hot water production system and new glazing (English)
9 July 2021
0 references
Abrantes, União das freguesias de Abrantes (São Vicente e São João) e Alferrarede
0 references
Identifiers
POSEUR-01-1203-FC-000065
0 references