Energy Efficiency at Hospital de Abrantes (Q2981185): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The Hospital de Abrantes proposes to reconvert its energy systems in order to obtain significant savings, maintaining and improving service outputs and security in supply. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in hot water production system and new glazing, remove_old_english_translation)
(‎Created claim: summary (P836): The Hospital de Abrantes proposes to reconvert its energy systems in order to obtain significant savings, maintaining and improving service outputs and security in supply. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in hot water production system and new glazing, translated_summary)
Property / summary
 
The Hospital de Abrantes proposes to reconvert its energy systems in order to obtain significant savings, maintaining and improving service outputs and security in supply. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in hot water production system and new glazing (English)
Property / summary: The Hospital de Abrantes proposes to reconvert its energy systems in order to obtain significant savings, maintaining and improving service outputs and security in supply. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in hot water production system and new glazing (English) / rank
 
Normal rank
Property / summary: The Hospital de Abrantes proposes to reconvert its energy systems in order to obtain significant savings, maintaining and improving service outputs and security in supply. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in hot water production system and new glazing (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 01:32, 9 July 2021

Project Q2981185 in Portugal
Language Label Description Also known as
English
Energy Efficiency at Hospital de Abrantes
Project Q2981185 in Portugal

    Statements

    0 references
    985,064.61 Euro
    0 references
    85.0 percent
    0 references
    1 January 2017
    0 references
    30 April 2021
    0 references
    CENTRO HOSPITALAR DO MÉDIO TEJO EPE
    0 references
    0 references

    39°30'21.53"N, 8°12'48.49"W
    0 references
    O Hospital de Abrantes propõe-se reconverter os seus sistemas energéticos, de forma a obter poupanças significativas, mantendo e melhorando os outputs de serviço e de segurança no abastecimento. Esta operação incidir sobre os drivers de consumo energético, nomeadamente: Introdução de LED, produção de energia através de painéis fotovoltaico, melhoria no sistema de produção de água quente e novos envidraçados (Portuguese)
    0 references
    The Hospital de Abrantes proposes to reconvert its energy systems in order to obtain significant savings, maintaining and improving service outputs and security in supply. This operation covers energy consumption drivers, in particular: Introduction of LED, power production through photovoltaic panels, improvement in hot water production system and new glazing (English)
    9 July 2021
    0 references
    Abrantes, União das freguesias de Abrantes (São Vicente e São João) e Alferrarede
    0 references

    Identifiers

    POSEUR-01-1203-FC-000065
    0 references