Refurbishment of the entrance work and maturation pond of the Almeirim/Alpiarça treatment plant (Q2982019): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Removed claim: summary (P836): It is intended to implement a pre-treatment operation of the effluent and the installation of a diluted hydrochloric acid dosage system on the surface of the ripening pond in order to avoid algae proliferation. The operation thus ensures an adequate treatment of the effluents collected for a population of 25006 inhabitants served and contributes to the improvement of the quality of the water bodies., remove_old_english_translation) |
||||||||||||||
Property / summary | |||||||||||||||
Property / summary: It is intended to implement a pre-treatment operation of the effluent and the installation of a diluted hydrochloric acid dosage system on the surface of the ripening pond in order to avoid algae proliferation. The operation thus ensures an adequate treatment of the effluents collected for a population of 25006 inhabitants served and contributes to the improvement of the quality of the water bodies. (English) / rank | |||||||||||||||
Property / summary: It is intended to implement a pre-treatment operation of the effluent and the installation of a diluted hydrochloric acid dosage system on the surface of the ripening pond in order to avoid algae proliferation. The operation thus ensures an adequate treatment of the effluents collected for a population of 25006 inhabitants served and contributes to the improvement of the quality of the water bodies. (English) / qualifier | |||||||||||||||
|
Revision as of 01:51, 9 July 2021
Project Q2982019 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Refurbishment of the entrance work and maturation pond of the Almeirim/Alpiarça treatment plant |
Project Q2982019 in Portugal |
Statements
196,854.22 Euro
0 references
85.0 percent
0 references
30 June 2016
0 references
21 April 2017
0 references
AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
0 references
Pretende-se implementar uma operação de pré-tratamento do efluente e ainda a instalação de um sistema de dosagem de ácido clorídrico diluído na superfície da lagoa de maturação, de modo a evitar a proliferação de algas. A operação garante assim um adequado tratamento dos efluentes recolhidos para uma população de 25006 habitantes servidos e contribui para a melhoria da qualidade das massas de água. (Portuguese)
0 references
Alpiarça, Alpiarça
0 references
Identifiers
POSEUR-03-2012-FC-000040
0 references