Q2982273 (Q2982273): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The present operation includes the installation of the low-level networks necessary to complete the Mezio Subsystem, as well as the geological study and topographic survey necessary for the respective project. It is also planned to install the high Interceptors to close this subsystem., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The present operation includes the installation of the low-level networks necessary to complete the Mezio Subsystem, as well as the geological study and topographic survey necessary for the respective project. It is also planned to install the high Interceptors to close this subsystem. (English) | |||||||||||||||
Property / summary: The present operation includes the installation of the low-level networks necessary to complete the Mezio Subsystem, as well as the geological study and topographic survey necessary for the respective project. It is also planned to install the high Interceptors to close this subsystem. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The present operation includes the installation of the low-level networks necessary to complete the Mezio Subsystem, as well as the geological study and topographic survey necessary for the respective project. It is also planned to install the high Interceptors to close this subsystem. (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 01:35, 9 July 2021
Project Q2982273 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2982273 in Portugal |
Statements
779,237.44 Euro
0 references
85.0 percent
0 references
10 August 2016
0 references
30 September 2020
0 references
MUNICÍPIO DE LOUSADA
0 references
A presente operação contempla a instalação das redes em baixa necessárias para concluir o Subsistema do Mezio, bem como o estudo geológico e o levantamento topográfico necessários para o respetivo projeto. Prevê-se também a instalação dos Intercetores em alta que permitem fechar este subsistema. (Portuguese)
0 references
The present operation includes the installation of the low-level networks necessary to complete the Mezio Subsystem, as well as the geological study and topographic survey necessary for the respective project. It is also planned to install the high Interceptors to close this subsystem. (English)
9 July 2021
0 references
Lousada
0 references
Identifiers
POSEUR-03-2012-FC-000380
0 references