Q2982664 (Q2982664): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): This operation aims to close down water supply systems in the municipality of Baião, with a view to extending the AA service to about 138 inhabitants/107 housing in the parishes of Santa Marinha do Zêzere (place of Fonseca) and Tresouras (place of Calvos), through the construction of the following infrastructures in SA AA Gestaçô: 6.3 km of AA Network and 107 AA Branches.The Eligible Investment of the Operation is EUR 306,009.43., translated_sum...)
Property / summary
 
This operation aims to close down water supply systems in the municipality of Baião, with a view to extending the AA service to about 138 inhabitants/107 housing in the parishes of Santa Marinha do Zêzere (place of Fonseca) and Tresouras (place of Calvos), through the construction of the following infrastructures in SA AA Gestaçô: 6.3 km of AA Network and 107 AA Branches.The Eligible Investment of the Operation is EUR 306,009.43. (English)
Property / summary: This operation aims to close down water supply systems in the municipality of Baião, with a view to extending the AA service to about 138 inhabitants/107 housing in the parishes of Santa Marinha do Zêzere (place of Fonseca) and Tresouras (place of Calvos), through the construction of the following infrastructures in SA AA Gestaçô: 6.3 km of AA Network and 107 AA Branches.The Eligible Investment of the Operation is EUR 306,009.43. (English) / rank
 
Normal rank
Property / summary: This operation aims to close down water supply systems in the municipality of Baião, with a view to extending the AA service to about 138 inhabitants/107 housing in the parishes of Santa Marinha do Zêzere (place of Fonseca) and Tresouras (place of Calvos), through the construction of the following infrastructures in SA AA Gestaçô: 6.3 km of AA Network and 107 AA Branches.The Eligible Investment of the Operation is EUR 306,009.43. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 02:10, 9 July 2021

Project Q2982664 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2982664 in Portugal

    Statements

    0 references
    217,164.22 Euro
    0 references
    85.0 percent
    0 references
    15 March 2017
    0 references
    31 December 2019
    0 references
    ÁGUAS DO NORTE, S.A.
    0 references
    0 references

    41°10'9.52"N, 7°58'38.28"W
    0 references
    Esta operação visa o fecho dos sistemas de abastecimentos de água em baixa no Município de Baião, com vista à extensão do serviço de AA a cerca de 138 habitantes/107 alojamentos das freguesias de Santa Marinha do Zêzere (lugar de Fonseca) e Tresouras (lugar de Calvos), através da construção das seguintes infraestruturas no SA AA Gestaçô: 6,3km de Rede AA e 107 Ramais de AA.O Investimento elegível da Operação é de 306.009,43€. (Portuguese)
    0 references
    This operation aims to close down water supply systems in the municipality of Baião, with a view to extending the AA service to about 138 inhabitants/107 housing in the parishes of Santa Marinha do Zêzere (place of Fonseca) and Tresouras (place of Calvos), through the construction of the following infrastructures in SA AA Gestaçô: 6.3 km of AA Network and 107 AA Branches.The Eligible Investment of the Operation is EUR 306,009.43. (English)
    9 July 2021
    0 references
    Baião
    0 references

    Identifiers

    POSEUR-03-2012-FC-001055
    0 references