Q2982624 (Q2982624): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The project to be implemented in the village of Vila Franca da Serra, aims to increase the degree of treatment to which waste water is currently subjected in the existing septic tank, through the installation of a sewage treatment plant with secondary treatment and to readjust the drainage networks and collectors to this solution, with the installation of an Elevatory Station and about 1000 m of collectors., translated_summary)
Property / summary
 
The project to be implemented in the village of Vila Franca da Serra, aims to increase the degree of treatment to which waste water is currently subjected in the existing septic tank, through the installation of a sewage treatment plant with secondary treatment and to readjust the drainage networks and collectors to this solution, with the installation of an Elevatory Station and about 1000 m of collectors. (English)
Property / summary: The project to be implemented in the village of Vila Franca da Serra, aims to increase the degree of treatment to which waste water is currently subjected in the existing septic tank, through the installation of a sewage treatment plant with secondary treatment and to readjust the drainage networks and collectors to this solution, with the installation of an Elevatory Station and about 1000 m of collectors. (English) / rank
 
Normal rank
Property / summary: The project to be implemented in the village of Vila Franca da Serra, aims to increase the degree of treatment to which waste water is currently subjected in the existing septic tank, through the installation of a sewage treatment plant with secondary treatment and to readjust the drainage networks and collectors to this solution, with the installation of an Elevatory Station and about 1000 m of collectors. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 02:09, 9 July 2021

Project Q2982624 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2982624 in Portugal

    Statements

    0 references
    309,911.89 Euro
    0 references
    85.0 percent
    0 references
    24 January 2018
    0 references
    31 July 2020
    0 references
    MUNICÍPIO DE GOUVEIA
    0 references
    0 references

    40°35'13.09"N, 7°32'22.67"W
    0 references
    O projeto a implementar na localidade de Vila Franca da Serra, visa aumentar o grau de tratamento a que as águas residuais são atualmente sujeitas na fossa séptica existente, através da instalação de uma ETAR com tratamento secundário e reajustar as redes de drenagem e coletores a esta solução, com a instalação de uma Estação Elevatória e cerca de 1000m de coletores. (Portuguese)
    0 references
    The project to be implemented in the village of Vila Franca da Serra, aims to increase the degree of treatment to which waste water is currently subjected in the existing septic tank, through the installation of a sewage treatment plant with secondary treatment and to readjust the drainage networks and collectors to this solution, with the installation of an Elevatory Station and about 1000 m of collectors. (English)
    9 July 2021
    0 references
    Gouveia, Vila Franca da Serra
    0 references

    Identifiers

    POSEUR-03-2012-FC-000996
    0 references