(Created claim: summary (P836): The operations of the operation, briefly, are as follows:i. Construction of a new treatment line as well as a system of ultraviolet disinfection for the two lines ii. Monitoring, measurement and regulation of flows from the various origins and phases of the system iii. Modernisation of the control system and its interconnection with the Telemanagement system (iv). Construction of a new pipeline while maintaining the existing connection, translat...) |
||||||||||||||
Property / summary | |||||||||||||||
The operations of the operation, briefly, are as follows:i. Construction of a new treatment line as well as a system of ultraviolet disinfection for the two lines ii. Monitoring, measurement and regulation of flows from the various origins and phases of the system iii. Modernisation of the control system and its interconnection with the Telemanagement system (iv). Construction of a new pipeline while maintaining the existing connection (English) | |||||||||||||||
Property / summary: The operations of the operation, briefly, are as follows:i. Construction of a new treatment line as well as a system of ultraviolet disinfection for the two lines ii. Monitoring, measurement and regulation of flows from the various origins and phases of the system iii. Modernisation of the control system and its interconnection with the Telemanagement system (iv). Construction of a new pipeline while maintaining the existing connection (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The operations of the operation, briefly, are as follows:i. Construction of a new treatment line as well as a system of ultraviolet disinfection for the two lines ii. Monitoring, measurement and regulation of flows from the various origins and phases of the system iii. Modernisation of the control system and its interconnection with the Telemanagement system (iv). Construction of a new pipeline while maintaining the existing connection (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 01:58, 9 July 2021
Project Q2982534 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2982534 in Portugal |
Statements
1,292,742.2 Euro
0 references
85.0 percent
0 references
30 April 2014
0 references
31 July 2020
0 references
A.R.M. - ÁGUAS E RESÍDUOS DA MADEIRA, S.A.
0 references
As intervenções da Operação, sumariamente, são as seguintes:i. Construção de uma nova linha de tratamento bem como de um sistema de desinfeção por ultravioletas para as duas linhas ii. Monitorização, medição e regulação dos caudais das diversas origens e fases do sistema iii. Modernização do sistema de controlo e sua interligação com o sistema de Telegestão iv). Construção de uma nova adutora, mantendo a ligação existente (Portuguese)
0 references
The operations of the operation, briefly, are as follows:i. Construction of a new treatment line as well as a system of ultraviolet disinfection for the two lines ii. Monitoring, measurement and regulation of flows from the various origins and phases of the system iii. Modernisation of the control system and its interconnection with the Telemanagement system (iv). Construction of a new pipeline while maintaining the existing connection (English)
9 July 2021
0 references
Ribeira Brava
0 references
Identifiers
POSEUR-03-2012-FC-000766
0 references