Q2982493 (Q2982493): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high., translated_summary)
Property / summary
 
The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high. (English)
Property / summary: The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high. (English) / rank
 
Normal rank
Property / summary: The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 01:52, 9 July 2021

Project Q2982493 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2982493 in Portugal

    Statements

    0 references
    700,832.56 Euro
    0 references
    85.0 percent
    0 references
    1 April 2017
    0 references
    31 March 2020
    0 references
    MUNICÍPIO DE PENELA
    0 references
    0 references

    40°1'45.98"N, 8°23'24.86"W
    0 references
    A operação consiste na execução de condutas adutoras uma extensão total de 8.296m, dois reservatórios e uma estação elevatória, com ligação ao sistema em “Alta”, no sentido de garantir a eficiência deste sistema.A operação contempla a construção destas adutoras que irão garantir o abastecimento de água às localidades de Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela e Fonte Redoiça com ligação ao sistema “em alta”. (Portuguese)
    0 references
    The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high. (English)
    9 July 2021
    0 references
    Penela
    0 references

    Identifiers

    POSEUR-03-2012-FC-000704
    0 references