Q2982399 (Q2982399): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The operation consists of the execution of 7615.07 ml of gravitic collectors and a lifting duct in a total length of 472 ml and 277 connecting branches, with connection to the penella subsystem.The operation includes the construction of sub-basins that will drain the places of Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Sales of Mills that will ensure the gravitational transport of the effluents with connection to the emissa...) |
||||||||||||||
Property / summary | |||||||||||||||
The operation consists of the execution of 7615.07 ml of gravitic collectors and a lifting duct in a total length of 472 ml and 277 connecting branches, with connection to the penella subsystem.The operation includes the construction of sub-basins that will drain the places of Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Sales of Mills that will ensure the gravitational transport of the effluents with connection to the emissary in high. (English) | |||||||||||||||
Property / summary: The operation consists of the execution of 7615.07 ml of gravitic collectors and a lifting duct in a total length of 472 ml and 277 connecting branches, with connection to the penella subsystem.The operation includes the construction of sub-basins that will drain the places of Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Sales of Mills that will ensure the gravitational transport of the effluents with connection to the emissary in high. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The operation consists of the execution of 7615.07 ml of gravitic collectors and a lifting duct in a total length of 472 ml and 277 connecting branches, with connection to the penella subsystem.The operation includes the construction of sub-basins that will drain the places of Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Sales of Mills that will ensure the gravitational transport of the effluents with connection to the emissary in high. (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 01:57, 9 July 2021
Project Q2982399 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2982399 in Portugal |
Statements
526,083.56 Euro
0 references
85.0 percent
0 references
30 September 2015
0 references
31 March 2018
0 references
MUNICÍPIO DE PENELA
0 references
A operação consiste na execução de 7.615,07ml de coletores gravíticos e uma conduta elevatória numa extensão total de 472ml e 277 ramais de ligação, com ligação ao subsistema de penela.A operação contempla a construção de sub-bacias que irão drenar os lugares de Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Vendas dos Moinhos que assegurarão o transporte gravítico dos efluentes com ligação ao emissário em alta. (Portuguese)
0 references
The operation consists of the execution of 7615.07 ml of gravitic collectors and a lifting duct in a total length of 472 ml and 277 connecting branches, with connection to the penella subsystem.The operation includes the construction of sub-basins that will drain the places of Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Sales of Mills that will ensure the gravitational transport of the effluents with connection to the emissary in high. (English)
9 July 2021
0 references
Penela
0 references
Identifiers
POSEUR-03-2012-FC-000565
0 references