Q2981463 (Q2981463): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways., translated_summary)
Property / summary
 
The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways. (English)
Property / summary: The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways. (English) / rank
 
Normal rank
Property / summary: The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 01:39, 9 July 2021

Project Q2981463 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2981463 in Portugal

    Statements

    0 references
    124,345.37 Euro
    0 references
    85.0 percent
    0 references
    9 October 2019
    0 references
    9 October 2020
    0 references
    MUNICÍPIO DE MIRA
    0 references
    0 references

    40°27'8.86"N, 8°47'58.81"W
    0 references
    O projeto objetiva-se na recuperação do sistema dunar entre a duna a sul da marginal e o último apoio da praia (com uma extensão de 680 metros), com soluções de estabilização e proteção do cordão dunar, através do recurso à implementação de passadiços. (Portuguese)
    0 references
    The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways. (English)
    9 July 2021
    0 references
    Mira, Praia de Mira
    0 references

    Identifiers

    POSEUR-02-1809-FC-000069
    0 references