Q2981463 (Q2981463): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways. (English) | |||||||||||||||
Property / summary: The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways. (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 01:39, 9 July 2021
Project Q2981463 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2981463 in Portugal |
Statements
124,345.37 Euro
0 references
85.0 percent
0 references
9 October 2019
0 references
9 October 2020
0 references
MUNICÍPIO DE MIRA
0 references
O projeto objetiva-se na recuperação do sistema dunar entre a duna a sul da marginal e o último apoio da praia (com uma extensão de 680 metros), com soluções de estabilização e proteção do cordão dunar, através do recurso à implementação de passadiços. (Portuguese)
0 references
The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways. (English)
9 July 2021
0 references
Mira, Praia de Mira
0 references
Identifiers
POSEUR-02-1809-FC-000069
0 references