Sustainable urban transport in Ostróda (Q132458): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): According to the ‘Project of the new municipal transport system for the City of Ostróda’, it is planned to purchase 12 low-emission buses (10 units. euro 6 and 2 electric vehicles). Purchased low-emission buses will replace current used in a large majority of at least 15 years. The associated infrastructure for the buses purchased will be 30 stops that will improve the safety of the bus and will allow shelter from adverse weather conditions and...)
Property / summary
 
According to the ‘Project of the new municipal transport system for the City of Ostróda’, it is planned to purchase 12 low-emission buses (10 units. euro 6 and 2 electric vehicles). Purchased low-emission buses will replace current used in a large majority of at least 15 years. The associated infrastructure for the buses purchased will be 30 stops that will improve the safety of the bus and will allow shelter from adverse weather conditions and will allow them to charge the rechargeable battery. The project also provides for the construction of a cycle path (with changes of exits from publ and turkeys, pass and barriers) of ca. 3.2 km, which will connect the City of Ostróda with the town of Ostróda, and the replacement of 18 luminaires for energy efficient lighting (replacement of 18 250 W LED bulbs each with a 78W LED lamp). The Supervisor will be responsible for supervising the construction path of the cycle path. Low emission buses and cycle paths will improve air quality and promote low-emission transport. Modernisation of lighting will improve energy efficiency. information activities for residents to promote the use of collective transport have also been seen. This project is compatible with Warmińsko-Mazurskie ROP 2014-2020 (action 4.4. Sustainable urban transport, 4.4.4 Public transport infrastructure (Low emission urban transport). The project, through the purchase of low-emission bus fleet with associated infrastructure, the construction of a cycle path and the modernisation of street lighting, will contribute to the improvement of sustainable urban mobility of the inhabitants of the Municipality of Ostróda and the Municipality of Ostróda. The project aims to improve: air quality, safety, travel comfort and reduced communication congestion. (English)
Property / summary: According to the ‘Project of the new municipal transport system for the City of Ostróda’, it is planned to purchase 12 low-emission buses (10 units. euro 6 and 2 electric vehicles). Purchased low-emission buses will replace current used in a large majority of at least 15 years. The associated infrastructure for the buses purchased will be 30 stops that will improve the safety of the bus and will allow shelter from adverse weather conditions and will allow them to charge the rechargeable battery. The project also provides for the construction of a cycle path (with changes of exits from publ and turkeys, pass and barriers) of ca. 3.2 km, which will connect the City of Ostróda with the town of Ostróda, and the replacement of 18 luminaires for energy efficient lighting (replacement of 18 250 W LED bulbs each with a 78W LED lamp). The Supervisor will be responsible for supervising the construction path of the cycle path. Low emission buses and cycle paths will improve air quality and promote low-emission transport. Modernisation of lighting will improve energy efficiency. information activities for residents to promote the use of collective transport have also been seen. This project is compatible with Warmińsko-Mazurskie ROP 2014-2020 (action 4.4. Sustainable urban transport, 4.4.4 Public transport infrastructure (Low emission urban transport). The project, through the purchase of low-emission bus fleet with associated infrastructure, the construction of a cycle path and the modernisation of street lighting, will contribute to the improvement of sustainable urban mobility of the inhabitants of the Municipality of Ostróda and the Municipality of Ostróda. The project aims to improve: air quality, safety, travel comfort and reduced communication congestion. (English) / rank
 
Normal rank

Revision as of 13:02, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Sustainable urban transport in Ostróda
Project in Poland financed by DG Regio

    Statements

    0 references
    14,032,167.28 zloty
    0 references
    3,367,720.1471999995 Euro
    13 January 2020
    0 references
    20,423,902.3 zloty
    0 references
    4,901,736.552 Euro
    13 January 2020
    0 references
    80.99 percent
    0 references
    14 July 2015
    0 references
    30 December 2020
    0 references
    GMINA MIEJSKA OSTRÓDA
    0 references

    53°42'10.1"N, 19°57'46.4"E
    0 references

    53°42'51.5"N, 19°56'13.9"E
    0 references
    Zgodnie z opracowanym "Projektem nowego systemu komunikacyjnego komunikacji miejskiej dla Miasta i Gminy Ostróda" zaplanowano zakup 12 niskoemisyjnych autobusów (10 szt. autob. spalinowych EURO 6 oraz 2 elektryczne). Zakupione niskoemisyjne autobusy zastąpią obecnie użytkowane w znacznej większości mające najmniej 15 lat. Infrastrukturą towarzyszącą dla zakupionych autobusów będą wiaty przystankowe (30 szt.), które wpłyną na poprawę bezpiecz. i umożliwią schronienie przed niekorzystnymi warunkami pogodowymi oraz urządzenie do ładowania baterii w autob. elektrycznych. Projekt przewiduje także budowę ścieżki rowerowej (wraz z przebudową zjazdów publ. i indywid., przepustem i barierami) o długości ok. 3,2 km, która połączy Miasto Ostróda z Gminą Ostróda, oraz wymianę 18 opraw oświetleniowych na energooszczędne (wymiana 18 szt. lamp sodowych o mocy 250W każda na lampy LED o mocy 78W). Nad prawidłowością prowadzenia robót budowlanych związanych z budową ścieżki rowerowej będzie czuwał Inspektor Nadzoru. Zarówno niskoemisyjne autobusy jak i ścieżka rowerowa przyczynią się do poprawy jakości powietrza oraz popularyzacji niskoemisyjnego transportu. Modernizacja oświetlenia ulicz. przyczyni się do poprawy efektywności energetycznej.Przewidziano również działania informacyjne dla mieszkańców w celu promocji korzystania z transportu zbiorowego. Niniejszy projekt jest zgodny z RPO Województwa Warmińsko-Mazurskiego na lata 2014–2020 (działanie 4.4. Zrównoważony transport miejski, poddz. 4.4.4 Infrastruktura transportu publicznego (Niskoemisyjny transport miejski)). Projekt poprzez zakup niskoemisyjnego taboru autobusowego wraz z infrastrukturą towarzyszącą, budowę ścieżki rowerowej oraz modernizację oświetlenia ulicznego przyczyni się do poprawy zrównoważonej mobilności miejskiej mieszkańców Gminy Miejskiej Ostróda oraz Gminy Ostróda. Projekt ma na celu poprawę: jakości powietrza atmosferycznego, bezpieczeństwa, komfortu podróży oraz zmniejszenia zatłoczenia komunikacyjnego. (Polish)
    0 references
    According to the ‘Project of the new municipal transport system for the City of Ostróda’, it is planned to purchase 12 low-emission buses (10 units. euro 6 and 2 electric vehicles). Purchased low-emission buses will replace current used in a large majority of at least 15 years. The associated infrastructure for the buses purchased will be 30 stops that will improve the safety of the bus and will allow shelter from adverse weather conditions and will allow them to charge the rechargeable battery. The project also provides for the construction of a cycle path (with changes of exits from publ and turkeys, pass and barriers) of ca. 3.2 km, which will connect the City of Ostróda with the town of Ostróda, and the replacement of 18 luminaires for energy efficient lighting (replacement of 18 250 W LED bulbs each with a 78W LED lamp). The Supervisor will be responsible for supervising the construction path of the cycle path. Low emission buses and cycle paths will improve air quality and promote low-emission transport. Modernisation of lighting will improve energy efficiency. information activities for residents to promote the use of collective transport have also been seen. This project is compatible with Warmińsko-Mazurskie ROP 2014-2020 (action 4.4. Sustainable urban transport, 4.4.4 Public transport infrastructure (Low emission urban transport). The project, through the purchase of low-emission bus fleet with associated infrastructure, the construction of a cycle path and the modernisation of street lighting, will contribute to the improvement of sustainable urban mobility of the inhabitants of the Municipality of Ostróda and the Municipality of Ostróda. The project aims to improve: air quality, safety, travel comfort and reduced communication congestion. (English)
    0 references

    Identifiers

    RPWM.04.04.04-28-0004/17
    0 references